Update Announcement
This proposal notice is being updated to advise the public that the permit application is still under review and the Ministry has placed the application on Temporary Hold to allow for additional time to adequately consider any concerns. The original proposal date and comment period have not been altered.
This consultation was open from:
October 14, 2020
to November 13, 2020
Decision summary
The Director of Exploration has made a decision on the exploration permit application PR-20-000309 to Noront Resources Limited for early exploration activities 132 kilometres north of Marten Falls Ontario, in BMA 527 861 area, District of Kenora.
The decision is to: Issue
Location details
Site location details
The mining activities are located approximately 132 kilometres: North of Marten Falls, in BMA 527 861, District of Kenora, Northwest Region.
Claim numbers instructions: “To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.”
Claim numbers: 104162, 104163, 104462, 118317, 119415, 119416, 121310, 121311, 121312, 129088, 129112, 137368, 141762, 159670, 160289, 160290, 163127, 166370, 172557, 176505, 180846, 182814, 185322, 185323, 185324, 200499, 219505, 222430, 222431, 225161, 230388, 233047, 233048, 236966, 251962, 259049, 259079, 260413, 271055, 274344, 278405, 281116, 297021, 312845, 325670, 328382, 328383, 338042.
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Noront Resources Ltd.
Alloy Place
886 A
Thunder Bay ,
ON
P7B 6E6
Canada
Decision details
February 25, 2022, the Ministry issued an exploration permit 132 kilometres north of Marten Falls Ontario, in BMA 527 861 area, District of Kenora. This permit will allow the company to:
Permit activities:
- mechanized drilling (assembled weight greater than 150 kilograms)
Plan activities
- line cutting (less than 1.5 metres in width)
- geophysical surveys
The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The issued exploration permit is valid for a period of three years from the date of issue.
Effects of consultation
Comments received were considered in the decision.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Neal Bennett
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Original proposal
Proposal details
Noront Muketei Minerals Ltd. has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow Noront Muketei Minerals Ltd. to carry out are as follows:
- mechanized drilling (where the drill weight is greater than 150 kilograms)
Plan Activities
- line cutting (less than 1.5 metres in width)
- geophysical surveys
The potential disturbance from the activities are described as:
Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Comment
Commenting is now closed.
This consultation was open from October 14, 2020
to November 13, 2020
Connect with us
Contact
Colin Hovi
435 James Street South
Suite B002
Thunder Bay,
ON
P7E 6E3
Canada
Comments received
Through the registry
2By email
0By mail
0