There is no requirement to post this notice on the Environmental Registry of Ontario, but we want to hear your thoughts. Submit a comment and tell us what you think. Learn about the consultation process and types of notices on the registry.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO 019-3498 on April 16, 2021.
This consultation was open from:
June 9, 2020
to July 24, 2020
Proposal summary
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air) for CRH Canada Group Inc., operating a ready-mix concrete batching plant located in the City of Toronto, Ontario.
Location details
Site address
8 Unwin Avenue
Toronto,
ON
M5A 3L1
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
CRH Canada Group Inc.
2300 Steeles Avenue West
Floor 4
Concord,
ON
L4K 5X6
Canada
Why consultation isn't required
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Proposal details
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (Air), which replaces all the current Environmental Compliance Approvals for Air at this facility, and includes the addition of new, or historically unapproved, sources for all emissions from CRH Canada Group Inc., a ready-mix concrete batching plant located in the City of Toronto, Ontario.
The application includes all sources at the facility, including:
- the delivery of raw materials
- production
- shipping
- all ancillary sources and processes at the site
This amendment is to reflect changes to the facility including the:
- relocation of the plant to a new area within the same site
- replacement of the plant with new equipment and configuration
Emissions to the air from this facility include total suspended particulate, calcium oxide, crystalline silica, and nitrogen oxides.
The Environmental Compliance Approval with Limited Operational Flexibility (Air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (Air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada