This consultation was open from:
March 10, 2020
to April 24, 2020
Decision summary
An Environmental Compliance Approval (Waste Site) 20-YOR-56917 for Thomas Houston Courtice Septic for a hauled sewage site was withdrawn by the proponent on April 2, 2020.
Location details
Site address
2990 Concession Road #4
Clarington,
ON
Canada
Site location details
Lot 3&4, Concession 4, Clarington
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Thomas Houston Courtice Septic
7028 Ridgeview Road
Port Hope,
ON
L1A 3V5
Canada
Decision details
Site Location: 2990 Concession Road #4 (see Map of Site Location)
Application Type: Renewal
Total Useable Area: 5.33 hectares
Type of Disposal: Surface Spreading
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
1259 Gardiners Road
Unit 3
Kingston,
ON
K7M 8S5
Canada
How to Appeal
Appeals are not allowed
The application was withdrawn by the proponent on April 2, 2020. No approval was issued.
Connect with us
Contact
Valeria Spezzano
230 Westney Road South
Floor 5
Ajax,
ON
L1S 7J5
Canada
Original proposal
Proposal details
Description of instrument
Hauled sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA).
Other information
- site location: 2990 Concession Road #4, Lot 3 & 4, Concession 4, Clarington
- application type: renew
- total useable area: 5.33 hectares
- type of disposal: surface spreading
Highlights of proposed approval requirements
Prior to operating at the site, the company shall develop written procedures covering the following:
- procedures for reporting to the ministry, and municipal authorities as required in the event a spill occurs at the site
- a list of the personnel responsible for operations at the Site.
The company shall ensure that all personnel involved in the operation of this hauled sewage disposal site are aware of the requirements of this approval and are trained in Spill Prevention.
Spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the company shall take appropriate remedial action to limit the impact. The company must ensure that no unnecessary off-site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this site.
Written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received.
No hauled sewage shall be spread or disposed of at the site when the ground is frozen, ice-covered or snow covered.
No hauled sewage shall be spread at the site under conditions where hauled sewage may runoff or discharge from the site.
Hauled sewage cannot be spread during winter months.
The approval sets out a maximum spreading rate. In addition, spreading cannot take place within specified distances of sensitive features such as surface water, wells and residences, or on steeper sloped land.
Prior to the spreading of hauled sewage, the operator shall ensure the useable spreading area is clearly flagged or digitally designated to clearly identify setbacks from sensitive features and any areas where spreading is not allowed.
No processed organic waste, grease trap waste or other waste, other than hauled sewage, shall be disposed of at the site.
Other
Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licences or permits that may be required from other authorities, such as the local municipality, conservation authority, MNRF and OMAFRA, have been acquired.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
1259 Gardiners Road
Unit 3
Kingston,
ON
K7M 8S5
Canada
Comment
Commenting is now closed.
This consultation was open from March 10, 2020
to April 24, 2020
Connect with us
Contact
Valeria Spezzano
230 Westney Road South
Floor 5
Ajax,
ON
L1S 7J5
Canada
Comments received
Through the registry
0By email
0By mail
0