The Director of Mine Rehabilitation has returned the amendment for refiling.
Location details
Site location details
The project site is in the Haultain Township, northeast of Gowganda. The mine access road is located off Highway 560, approximately 37 kilometres east of Elk Lake; the main area/compound is situated on the mine road, approximately 3 KM north of Highway 560. Mine site is located near LeHeup Lake.
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Canada Cobalt Works Inc.
3026 Quadra Court
Coquitlam,
BC
V6E 1H5
Canada
Decision details
The amendment did not meet all the requirements for a certified Closure Plan.
Effects of consultation
No comments were received through the Environmental Registry of Ontario resulting in no impact on the decision whether or not to proceed with this amendment.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
How to Appeal
Appeals are not allowed
This instrument type cannot be appealed. Learn more about our consultation process.
Connect with us
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Original proposal
Proposal details
Canada Cobalt Works Inc. has submitted a Mine Closure Plan Amendment for filing by ENDM as required under the Mining Act.
This Closure Plan Amendment is for additional work being carried out as part of the Castle Mine Advanced Exploration Project. This Amendment describes rehabilitation work, including timber and waste rock removal; blasting floor for ventilation tube placement, and establishment of a small backfill plans contained with a sea can, that allows for historical on-site tailings to be used to backfill test stope(s) with cemented tailings backfill.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Comment
Commenting is now closed.
This consultation was open from September 24, 2019
to October 24, 2019
Connect with us
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Comments received
Through the registry
0By email
0By mail
0