This consultation was open from:
June 13, 2019
to July 13, 2019
Decision summary
A permit to take water was not required.
Location details
Site location details
Serpent River Generation Station
Lot 1 Concession 3 & 4
Township of The North Shore, District of Algoma
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Beaver Power Corporation
243 Industrial Park Circle
Sault Ste. Marie,
ON
P6B 5P3
Canada
Decision details
Amendments to the Ontario Water Resources Act (OWRA) made on April 1, 2020 removed the need for a permit to take water for the construction or operation of a dam for the purposes of generating electricity.
This activity no longer requires a permit and none was issued.
The ministry advised the applicant that no permit was required on November 2, 2020.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Connect with us
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Original proposal
Proposal details
This proposal is for a renewal of Permit to Take Water No. 3476-87BHR3 for industrial power generation. Water will be taken from one online pond. Details of the water taking are as follows:
Permit type - renewal
- source name: camp lake
- purpose: industrial power generation
- maximum rate per minute (litres): 1,080,000
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 1,555,200,000
- maximum number of days of taking per year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Comment
Commenting is now closed.
This consultation was open from June 13, 2019
to July 13, 2019
Connect with us
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Comments received
Through the registry
0By email
0By mail
0