This consultation was open from:
May 3, 2018
to June 17, 2018
Decision summary
An Environmental Compliance Approval (Waste Site) 18-PET-18966 for Johnson Septic Services Ltd. for a hauled sewage site in Alnwick Haldimand Twp was withdrawn by the proponent on September 28, 2018.
Location details
Site address
10226 Beaver Meadow Road
Alnwick/Haldimand,
ON
K0K 2H0
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Johnson Septic Service Limited
10226 Beaver Meadow Road
Alnwick/Haldimand,
ON
K0K 2H0
Canada
Decision details
An Environmental Compliance Approval (Waste Site) 18-PET-18966 for Johnson Septic Services Ltd. for a hauled sewage site was withdrawn by the proponent on September 28, 2018.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
How to Appeal
Appeals are not allowed
This application was withdrawn. No leave to appeal applies.
Connect with us
Contact
John Crouter
300 Water Street
Floor 2, Robinson Place South Tower
Peterborough,
ON
K9J 3C7
Canada
Original proposal
Proposal details
Description of instrument
Hauled Sewage, commonly known as septage, is the waste material removed from portable toilets, sewage holding tanks and septic systems. Untreated hauled sewage from holding tanks and septic tanks may be disposed of on land in accordance with an Environmental Compliance Approval (ECA) issued under the Environmental Protection Act (EPA).
This proposal is for the issuance of an Environmental Compliance Approval for a hauled sewage disposal site.
Other information
Site details
Application Type: Renewal
Total Useable Area: 8.10 hectares
Type of Disposal: surface Spreading
Highligts of proposed approval requirements
Prior to operating at the Site, the Company shall develop written procedures covering the following:
- procedures for reporting to the Ministry, and municipal authorities as required in the event a spill occurs at the Site
- a list of the personnel responsible for operations at the Site
The Company shall ensure that all personnel involved in the operation of this Hauled Sewage Disposal Site are aware of the requirements of this Approval and are trained in Spill Prevention.
Spills of a pollutant that cause or may cause an adverse effect are to be reported to the Ministry's Spills Action Centre and the Company shall take appropriate remedial action to limit the impact. The Company must ensure that no unnecessary off-Site effects, such as vermin, vectors, odour, dust, litter, noise or traffic, result from the operation of this Site.
Written records must be maintained in a log book that documents daily operations as well as any spills that occur and any complaints received.
No Hauled Sewage shall be spread or disposed of at the Site when the ground is frozen, ice-covered or snow covered;
No Hauled Sewage shall be spread at the Site under conditions where Hauled Sewage may runoff or discharge from the Site.
Hauled sewage cannot be spread during winter months.
The approval sets out a maximum spreading rate. In addition, spreading cannot take place within specified distances of sensitive features such as surface water, wells and residences, or on steeper sloped land.
Prior to the spreading of hauled sewage, the operator shall ensure the useable spreading area is clearly flagged or digitally designated to clearly identify setbacks from sensitive features and any areas where spreading is not allowed.
No processed organic waste, grease trap waste or other waste, other than Hauled Sewage, shall be disposed of at the Site.
Other
Prior to the spreading of hauled sewage, the operator is responsible for ensuring that all necessary approvals, licences or permits that may be required from other authorities, such as the local municipality, conservation authority, MNRF and OMAFRA, have been acquired.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from May 3, 2018
to June 17, 2018
Connect with us
Contact
Keith Jamieson
1259 Gardiners Road
Unit 3
Kingston,
ON
K7P 3J6
Canada
Comments received
Through the registry
0By email
0By mail
0