This consultation was open from:
June 19, 2015
to July 19, 2015
Decision summary
A permit to take water was not required.
Location details
Site location details
Ragged Chute G.S. - Montreal River
25 km South of New Liskard, Township of Gillies Limit, Town of Latchford, District of Timiskaming
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Ragged Chute Energy Inc.
110 12th Avenue Southwest
Calgary,
AB
T2P 2M1
Canada
Decision details
Amendments to the Ontario Water Resources Act (OWRA) made on April 1, 2020 removed the need for a permit to take water for the construction or operation of a dam for the purposes of generating electricity.
This activity no longer requires a permit and none was issued.
The ministry advised the applicant that no permit was required on August 26, 2020.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Connect with us
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Original proposal
Proposal details
This proposal notice was updated on September 12, 2017 to advise the public that this application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
This application is for a renewal of a Permit to Take Water for power production purposes. Water will be taken from the Montreal River to generate hydroelectricity at the Ragged Chutes Hydroelectric Plant. The existing Permit expires on August 31, 2015. Details of proposed water taking are as follows:
Permit type: Renewal of Permit # 2212-9AZGN5
Source Name: Montreal River
Purpose: Industrial - Power Production
Maximum Rate (Litres Per Minute): 3,499,800
Maximum Number of Hours of Taking per Day: 24
Maximum Volume (Litres) Per Day: 5,039,712,000
Maximum Number of Days of Taking in a Year: 365
Period of Water Taking: Year-round
Length of Water Taking: 10 years
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Comment
Commenting is now closed.
This consultation was open from June 19, 2015
to July 19, 2015
Connect with us
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Comments received
Through the registry
0By email
0By mail
0