This consultation was open from:
October 30, 2013
to November 29, 2013
Decision summary
A permit to take water was not required.
Location details
Site location details
Mission Generating Station at Magpie River
Geographic Township of Lendrum, Township of Michipicoten, District of Algoma
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Great Lakes Power Limited
243 Industrial Park Crescent
Sault Ste. Marie,
ON
P6B 5P3
Canada
Decision details
Amendments to the Ontario Water Resources Act (OWRA) made on April 1, 2020 removed the need for a permit to take water for the construction or operation of a dam for the purposes of generating electricity.
This activity no longer requires a permit and none was issued.
The ministry advised the applicant that no permit was required on August 26, 2020.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Connect with us
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Original proposal
Proposal details
Description of instrument
This proposal is for a renewal to Permit to Take Water #6641-825RPV for industrial purposes. Water will be taken from Magpie River for power production, in the geographic Township of Michipicoten, District of Algoma, Ontario. Details of Water Taking are as follows:
Permit type - Renewal (Category 1)
Purpose of Water Taking: Industrial - Power Production
Source of water: Magpie River
Maximum Rate Per Minute (Litres): 3,000,000.00
Maximum Number of Hours of Taking per Day: 24
Maximum Volume Per Day (Litres): 3,888,000,000.00
Maximum Number of Days of Taking in a Year: 365
Earliest Calendar date of taking (mm/dd): 01/01
Latest Calendar date of taking (mm/dd): 12/31
Period of Water Taking: 10 years
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Comment
Commenting is now closed.
This consultation was open from October 30, 2013
to November 29, 2013
Connect with us
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Comments received
Through the registry
0By email
0By mail
0