Update Announcement
This proposal notice has been updated on February 27, 2024, to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 23 décembre 2022
au 6 février 2023
Résumé de la proposition
This proposal is for an amendment to Environmental Compliance Approval No. 5263-BRWP8N (air and noise) for Orion Eco Solutions Inc., for the operation of a manufacturing facility that produces diesel, located at 94 Vibert Road in Oliver Paipoonge, Ontario.
Détails de l'emplacement
Adresse du site
94 Vibert Road
Oliver Paipoonge,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Orion Eco Solutions Inc.
4 Cardico Drive
Unit 1
Gormley,
ON
L0H 1G0
Canada
Détails de la proposition
This proposal is for an amendment to Environmental Compliance Approval No. 5263-BRWP8N (air and noise) for Orion Eco Solutions Inc., for the operation of a manufacturing facility that produces diesel, located at 94 Vibert Road in Oliver Paipoonge, Ontario.
This application includes all emissions from the facility that exhaust to the atmosphere including the emissions from the gasification process and the biomass-to-diesel process. Contaminant emissions to the atmosphere include:
- carbon monoxide
- hydrogen chloride
- hydrogen fluoride
- nitrogen oxide
- particulate matter
- sulfur dioxide
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 23 décembre 2022
au 6 février 2023