Update Announcement
This proposal notice has been updated on February 27, 2024, to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 5 avril 2022
au 5 mai 2022
Résumé de la proposition
This proposal is to renew Permit To Take Water No. 0881-ACAGWC for Alamos Gold Inc. Water will be taken from one (1) pond for pit and quarry dewatering purposes, located in the Township of Matachewan, Ontario.
Détails de l'emplacement
Adresse du site
Young-Davidson Mine
Highway 566
Matachewan,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Alamos Gold Inc.
Highway 566, Mine Site
Matachewan,
ON
P0K 1M0
Canada
Détails de la proposition
This proposal is to renew Permit To Take Water No. 0881-ACAGWC for Alamos Gold Inc. Water will be taken from one (1) pond for pit and quarry dewatering purposes, located in the Township of Matachewan, Ontario. Details of the water taking are as follows:
Source name: Young-Davidson Pit
- purpose of taking: pit and quarry dewatering
- maximum rate per minute (litres): 5,000
- maximum number of hours of taking per day: 24
- maximum volume per day (litres): 7,000,000.00
- maximum number of days of taking per year: 365
- period of taking: January 1 to December 31 for 10 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 5 avril 2022
au 5 mai 2022