Cette consultation a eu lieu :
du 25 février 2022
au 11 avril 2022
Résumé de la décision
We have issued an Environmental Compliance Approval for the upgrades to the existing works for the treatment and subsurface disposal of domestic sewage to service Fiddlehead Resort Camp, consisting of 46 trailer sites, comfort station, 3-bedroom dwelling, and three cottages located at 50 Oliphant Way in the Town of South Bruce Peninsula, Ontario.
Détails de l'emplacement
Adresse du site
50 Oliphant Way
South Bruce Peninsula,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Jason Glenn Shaw and Leah Anne Shaw, operating as Fiddlehead Resort Camp
50 Oliphant Way
South Bruce Peninsula,
ON
N0H 2T0
Canada
Détails de la décision
We have issued an Environmental Compliance Approval for the upgrades to the existing works for the treatment and subsurface disposal of domestic sewage to service Fiddlehead Resort Camp, consisting of:
- 46 trailer sites
- comfort station
- 3-bedroom dwelling
- three cottages
The camp is located at 50 Oliphant Way in the Town of South Bruce Peninsula, Ontario.
The approved works consist of the installation of the septic tanks, pump chambers and filter beds to service the:
- 3-bedroom dwelling
- the three cottages
In addition, the approved works include the decommissioning of the existing leaching beds servicing the above-noted:
- 3-bedroom dwelling
- the three cottages
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
101 17th Street East
Floor 3
Owen Sound,
ON
N4K 0A5
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 19 janvier 2023 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Jason Glenn Shaw and Leah Anne Shaw, operating as Fiddlehead Resort Camp
50 Oliphant Way
South Bruce Peninsula,
ON
N0H 2T0
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
The proposal is for a new Environmental Compliance Approval for the improvement of on-site sewage works that service the existing campground facilities and on-site residence at the Fiddlehead Resort Camp, located in the Town of South Bruce Peninsula, Ontario.
The peak sewage rate of sewage generation is expected to remain at the current rate of 19,200 litres per day.
The upgrades will involve the construction of two sewage systems:
- one for seasonal campground use
- one for year-round residential use
They will include:
- new raised tile beds
- pumping chambers
- dosing tank systems
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 25 février 2022
au 11 avril 2022
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0