Daniels HR Corporation - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-3755
Numéro de référence du ministère
1771-C35FJ5
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 2 juin 2021 au 2 juillet 2021 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 2 juin 2021
au 2 juillet 2021

Résumé de la décision

This Permit to Take Water for Daniels HR Corporation to take water is for construction-dewatering and long term foundation drainage from dewatering array and foundation drains located in the City of Toronto. The Permit to Take Water No. is 6756-C63LV6, and was issued on August 25, 2021.

Détails de l'emplacement

Adresse du site

2475 Eglinton Avenue West
Mississauga, ON
Canada

Détails de l'emplacement du site

Lot 1, Concession 5 West

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Daniels HR Corporation
130 Queens Quay East
Toronto, ON
M5A 0P6
Canada

Détails de la décision

A new Permit to Take Water was issued to Daniels HR Corporation to take water for construction-dewatering and long term foundation drainage from dewatering array and foundation drains. The water taking is as follows:

Source name and type: 1 - dewatering array

  • purpose of taking: construction-dewatering
  • maximum rate per minute (litres per minute): 387
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day: 557,150 litres
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 06/01
  • latest calendar date of taking (mm/dd): 05/31
  • length of taking: 10 years

Source name and type: 2 - dewatering array

  • purpose of taking: long term foundation drainage
  • maximum rate per minute (litres per minute): 87
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day: 125,850 litres
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 06/01
  • latest calendar date of taking (mm/dd): 05/31
  • length of taking: 10 years

Request a copy of the permit.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Environmental Permissions Branch - Permit to Take Water Unit
Address

135 St Clair Ave W
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 25 août 2021 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Danielle Beausoleil
M.E.S.; Environmental Scientist

Environmental Permissions Branch
135 St Clair Ave W
Toronto, ON
M4V 1P5
Canada

(519) -859-9650

Proponent(s)

Daniels HR Corporation
130 Queens Quay East
Toronto, ON
M5A 0P6
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
019-3755
Numéro de référence du ministère
1771-C35FJ5

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-3755
Numéro de référence du ministère
1771-C35FJ5
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

2 juin 2021 - 2 juillet 2021 (30 days)

Détails de la proposition

This proposal is for a new Permit to Take Water for Daniels HR Corporation to take water for construction-dewatering and long term foundation drainage from dewatering array and foundation drains. The water taking is as follows:

Source name and type: 1 - dewatering array

  • purpose of taking: construction-dewatering
  • maximum rate per minute (litres per minute): 387
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day: 557,150 litres
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 06/01
  • latest calendar date of taking (mm/dd): 05/31
  • length of taking: 10 years

Source name and type: 2 - dewatering array

  • purpose of taking: long term foundation drainage
  • maximum rate per minute (litres per minute): 87
  • maximum number of hours of taking per day: 24
  • maximum volume of taking per day: 125,850 litres
  • maximum number of days of taking in a year: 365
  • earliest calendar date of taking (mm/dd): 06/01
  • latest calendar date of taking (mm/dd): 05/31
  • length of taking: 10 years

More about Permits to Take Water

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 2 juin 2021
au 2 juillet 2021

Communiquer avec nous

Contact