Cette consultation a eu lieu :
du 3 octobre 2017
au 2 novembre 2017
Résumé de la décision
A permit to take water was not required.
Détails de l'emplacement
Détails de l'emplacement du site
Hurdman Generating Station - Mattawa River
Part: 1 2, Plan: 36R-6424
Part of 106 Acre Block
Township of Papineau-Cameron, District of Nipissing
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Algonquin Power (Canada) Holdings Incorporated (Algonquin Power Systems Incorporated)
354 Davis Road
Oakville,
ON
L6J 2X1
Canada
Détails de la décision
Amendments to the Ontario Water Resources Act (OWRA) made on April 1, 2020 removed the need for a permit to take water for the construction or operation of a dam for the purposes of generating electricity.
This activity no longer requires a permit and none was issued.
The ministry advised the applicant that no permit was required on August 26, 2020.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Proposition initiale
Détails de la proposition
Description of Instrument
This proposal is for renewal of Permit to Take Water No. 7048-AA9PND, for Algonquin Power (Canada) Holdings Inc.
The details of water taking as follows:
- Source Name: Mattawa River (Hurdman Generating Station)
- Purpose: Industrial (Power Production)
- Maximum rate per minute (litres): 672,000
- Maximum number of hours of taking a day: 24
- Maximum volume per day (litres): 967,680,000
- Maximum number of days of taking in a year: 365
- Earliest calendar date of taking (mm/dd): 01/01
- Latest calendar date of taking (mm/dd): 12/31
- Period of water taking: 10 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 3 octobre 2017
au 2 novembre 2017
Communiquer avec nous
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0