Cette consultation a eu lieu :
du 26 août 2011
au 25 septembre 2011
Résumé de la décision
A permit to take water was not required.
Détails de l'emplacement
Détails de l'emplacement du site
Shekak Generating Station - Shekak River
Lot: 2, Concession: 10, McMillan, Unorganized Township, District of Cochrane
McMillan
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Algonquin Power General Partner (Nagagami) Inc.
105 Mills Drive
Wawa,
ON
P0S 1K0
Canada
Détails de la décision
Amendments to the Ontario Water Resources Act (OWRA) made on April 1, 2020 removed the need for a permit to take water for the construction or operation of a dam for the purposes of generating electricity.
This activity no longer requires a permit and none was issued.
The ministry advised the applicant that no permit was required on August 26, 2020.
Effets de la consultation
A comment was received to clarify the permit renewal process. The ministry responded to the commenter directly with further information.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Jacinth Gilliam-Price
Proposition initiale
Détails de la proposition
Description of instrument
This proposal is for the renewal of the current Permit to Take Water number 1871-8B9Q94, for taking of water from the Shekak River for the purpose of power production.
The taking of water is as follows:
- Source of water: Shekak River
- Purpose of taking: Industrial - Power Production
- Maximum rate per minute (Litres): 2,734,800
- Maximum number of hours of taking per day: 24
- Maximum volume per day (Litres): 3,938,112,000
- Maximum number of days of taking per year: 365
- Earliest calendar date of taking (mm/dd): 01/01
- Latest calendar date of taking (mm/dd): 12/31
- Length of time: 10 years - if WMP is not complete, 1 year
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 26 août 2011
au 25 septembre 2011
Commentaires reçus
Par l'entremise du registre
1Par courriel
0Par la poste
0