Cette consultation a eu lieu :
du 11 janvier 2018
au 25 février 2018
Résumé de la décision
Parkbridge Lifestyle Communities Incorporated has requested to withdraw their application for an amendment to Environmental Compliance Approval No.5451-8L9HKD.
Détails de l'emplacement
Adresse du site
1001 Haldimand Road
17 Road
Haldimand,
ON
N0A 1E0
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Parkbridge Lifestyle Communities Incorporated
690 River Road West
Wasaga Beach,
ON
L9Z 2P1
Canada
Détails de la décision
This proposal was for an amendment to Environmental Compliance Approval No. 5451-8L9HKD to upgrade the existing sewage works at Grand River Resort in Cayuga, Haldimand County.
Parkbridge Lifestyle Communities Incorporated has requested to withdraw their application for an amendment to Environmental Compliance Approval No.5451-8L9HKD. We have withdrawn the application and closed the file.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
119 King Street West
Floor 9
Hamilton,
ON
L8P 4Y7
Canada
How to Appeal
Appeals are not allowed
There is no mechanism to appeal an application which has been withdrawn.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
Description of instrument
This application is for and amendment to Environmental Compliance Approval Number 5451-8L9HKD to upgrade the existing sewage works at Grand River Resort in Cayuga, Haldimand County.
The rated capacity of the existing sewage works is 100,000 litres per day and this will not be altered by the proposed sewage works upgrades.
The proposed upgrades include converting the existing treated effluent subsurface disposal system to a surface water disposal system, ultimately discharging to the Grand River through the existing ponds and Grand River Marshes Wetland Complex. All components of the existing sewage works will remain in use.
The proposed upgrades include a new phosphorus removal system and a UV disinfection system.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
119 King Street West
Floor 9
Hamilton,
ON
L8P 4Y7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 11 janvier 2018
au 25 février 2018
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0