Cette consultation a eu lieu :
du 25 janvier 2018
au 4 mars 2018
Résumé de la décision
A permit to take water was not required.
Détails de l'emplacement
Détails de l'emplacement du site
50 Bay Street
Lot 11, Concession 4
Municipality of Charlton and Dack
District of Timiskaming
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Kagawong Power Incorporated
37 McGill Street North
Smiths Falls,
ON
K7A 2J6
Canada
Détails de la décision
Amendments to the Ontario Water Resources Act (OWRA) made on April 1, 2020 removed the need for a permit to take water for the construction or operation of a dam for the purposes of generating electricity.
This activity no longer requires a permit and none was issued.
The ministry advised the applicant that no permit was required on August 26, 2020.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Ontario Government Complex
5520 Hwy 101 E, PO Bag 3080
South Porcupine,
ON
P0N 1H0
Canada
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
135 St Clair Ave W
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Proposition initiale
Détails de la proposition
Description of instrument
This proposal is to renew Permit to Take Water No. 1638-7R5N5S for power production purposes. Water will be taken from the Englehart River related to power generation activities, in the Municipality of Charlton and Dack, District of Timiskaming, Ontario.
Details of Water Taking are as follows:
Permit Type - Renewal (Category 1)
- Purpose of Water Taking: Industrial – Power production
- Source of Water: Englehart River
- Maximum Rate (Litres Per Minute): 435,600
- Maximum Number of Hours of Taking per Day: 24
- Maximum Volume (Litres) Per Day: 627,264,000
- Maximum Number of Days of Taking in a Year: 366
- Earliest Calendar date of taking (mm/dd): 01/01
- Latest Calendar date of taking (mm/dd): 12/31
- Period of Water Taking: 10 Years
More about Permits to take water
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Ontario Government Complex
5520 Hwy 101 E, PO Bag 3080
South Porcupine,
ON
P0N 1H0
Canada
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 25 janvier 2018
au 4 mars 2018
Communiquer avec nous
Contact
Permit to take water coordinator (Northern region)
435 James Street South
Floor 3, Suite 331
Thunder Bay,
ON
P7E 6S7
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0