Cette consultation a eu lieu :
du 14 août 2024
au 13 septembre 2024
Résumé de la décision
A certificate of property use was issued to Timestone Corporation for the property located at 319 Lasalle Boulevard, Sudbury.
Détails de l'emplacement
Adresse du site
319 Lasalle Boulevard
Greater Sudbury,
ON
P3A 1W7
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Timestone Corporation
1730 Regent Street South
Unit 5
Sudbury,
ON
P3E 3Z8
Canada
Détails de la décision
Certificate of Property Use (CPU) No. 4284-D7VNXN was issued to Timestone Corporation for the property located at 319 Lasalle Boulevard, Sudbury, Ontario on September 16, 2024.
The CPU requires the instrument holder to ensure that the following key risk management measures are undertaken:
- installing, inspecting and maintaining barriers to site soils on the property;
- inspecting and monitoring the drainage culvert that runs under the property;
- property use restrictions related to landscaping and growing food for human consumption;
- implementing a soil management plan;
- implementing a health and safety plan;
- annual reporting
An Environmental Protection Act (EPA) section 197 Order is included in the CPU and requires that a certificate be registered on the property title in accordance with section 197 of the Act, and that before dealing with the property in any way, a copy of the CPU must be given to any person who will acquire an interest in the property.
A copy of the final CPU, including the section 197 Order, is provided as a link under the supporting materials section of this notice.
Effets de la consultation
No comments were received.
A typo in Table 1A: property specific standards in Schedule A was corrected for PHC F2.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
199 Larch Street
Suite 1201
Sudbury,
ON
P3E 5P9
Canada
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 17 octobre 2024 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Timestone Corporation
1730 Regent Street South
Unit 5
Sudbury,
ON
P3E 3Z8
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Peter Wideman
933 Ramsey Lake Rd
4 th Floor
Sudbury,
ON
P3E 6B5
Canada
Proposition initiale
Détails de la proposition
A risk assessment was undertaken for this property to establish the risks that the contaminants identified in the risk assessment may pose to future users and to identify appropriate risk management measures to be implemented to ensure that the property is suitable for the intended use of residential use as defined by O. Reg. 153/04.
The ministry’s review of the risk assessment involved the following reports, documents and information/correspondence:
- “Risk Assessment, 319 Lasalle Boulevard, Sudbury, Ontario”, report prepared by Englobe Corp.; dated November 10, 2023, and
- “Risk Assessment, 319 Lasalle Boulevard, Sudbury, Ontario”, report prepared by Englobe Corp., dated May 9, 2024
Based on the documents provided to the ministry as part of the risk assessment report, the reviewers can confirm that the risk assessment has been conducted in accordance with the Environmental Protection Act (the act), Ontario Regulation 153/04 (the regulation), and the associated guidance documents.
The director provided the proponent with written Notice of the Director’s Decision to accept the risk assessment No. 3553-CTEFFY relating to the property in accordance with s.168.5 of the act on June 20, 2024.
The director is considering the issuance of a Certificate of Property Use (CPU) in relation to the site. The proposed CPU incorporates the risk management measures proposed in the risk assessment and additional conditions proposed by the director. The proposed Certificate of Property Use (CPU) No. 4284-D7VNXN is attached.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
933 Ramsey Lake Rd
4 th Floor
Sudbury,
ON
P3E 6B5
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 14 août 2024
au 13 septembre 2024
Communiquer avec nous
Contact
Peter Wideman
933 Ramsey Lake Rd
4 th Floor
Sudbury,
ON
P3E 6B5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0