Cette consultation a eu lieu :
du 28 mai 2024
au 12 juillet 2024
Résumé de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) from Molten Metallurgy Inc., a steel and iron castings manufacturing facility located in Paris, Ontario.
Détails de l'emplacement
Adresse du site
20 Lee Avenue
Paris,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Molten Metallurgy Inc.
20 Lee Avenue
Paris,
ON
N3L 3T6
Canada
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air) which replaces all the current Environmental Compliance Approvals for air at this facility and includes the addition of new or historically unapproved sources for all emissions from Molten Metallurgy Inc., a steel and iron castings manufacturing facility located in Paris, Ontario.
The application includes all sources at the facility that exhaust to the atmosphere, including:
- electric induction furnaces
- heat treating ovens
- generators
- cooling towers
- dust collectors
- storage silos
Emissions to the air from this facility include:
- ferric oxide
- calcium oxide
- lead
- cadmium
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 28 mai 2024
au 12 juillet 2024