Cette consultation a eu lieu :
du 1 mai 2024
au 15 juin 2024
Résumé de la proposition
This proposal is to amend Environmental Compliance Approval (air & noise) No. 4995-7PRUQK issued to Miller Paving Limited a ready-mix concrete facility located at 6690 12th Line, Minto.
Détails de l'emplacement
Adresse du site
6690 12th Line
Minto,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Miller Paving Limited
281 Hillmount Road
Markham,
ON
L6C 2S3
Canada
Détails de la proposition
This proposal is to amend Environmental Compliance Approval (air & noise) No. 4995-7PRUQK issued to Miller Paving Limited a ready-mix concrete facility located at 6690 12th Line, Minto.
This amendment is for one ready-mix concrete facility including baghouse dust collectors and natural gas fired steam generator.
Contaminant emissions to the atmosphere include:
- particulate matter
- respirable crystalline silica
- portland cement
- slag, and
- nitrogen oxides
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 1 mai 2024
au 15 juin 2024