Story Environmental Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-8093
Numéro de référence du ministère
4545-CYXMPC
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 3 janvier 2024 au 17 février 2024 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 3 janvier 2024
au 17 février 2024

Résumé de la proposition

Story Environmental Inc. proposes to operate a mobile treatment system to treat and manage water which accumulates in the Advanced Exploration Pit at the Crawford Nickel Project site. The operation of the mobile treatment system will be approved under a Notice of Site-Specific Change under Environmental Compliance Approval No. 8566-CASQZH.

Détails de l'emplacement

Adresse du site

ON
Canada

Détails de l'emplacement du site

Mobile Facility operating at the Crawford Nickel Project site approximately 35 kilometres north of Timmins, Ontario

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Story Environmental Inc.
332 Main Street
P.O. Box 716
Haileybury, ON
P0J 1K0
Canada

Détails de la proposition

Story Environmental Inc. proposes to operate a mobile treatment system to treat and manage water which accumulates in the Advanced Exploration Pit at the Crawford Nickel Project site, approximately 35 kilometres north of Timmins, Ontario. The operation of this mobile treatment system will be approved under a Notice of Site-Specific Change under Story Environmental Inc.’s Environmental Compliance Approval No. 8566-CASQZH.

This treatment system has been designed to operate at approximately 4 litres per second, but may operate at 13 litres per second during storm events. The treated water will be discharged to the West Buskegau River.

The system will consist of the following treatment steps:

  • pH adjustment to precipitate metals
  • coagulation
  • flocculation
  • clarification
  • filtration

It may also require final pH adjustment before discharge to ensure it meets the effluent limits established as part of the Assimilative Capacity Assessment. Daily, weekly, and monthly monitoring will take place to ensure that the system adheres to the requirements of the Environmental Compliance Approval and the Assimilative Capacity Study.

The system will operate for a short-term, from late January 2024 to the end of April 2024. The Assimilative Capacity Study for the discharge of this water to the West Buskegau indicates that there will be no significant adverse effects to the river as a result of the discharge from this mobile treatment system.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 3 janvier 2024
au 17 février 2024

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis