G. Tackaberry & Sons Construction Company Limited - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-7845
Numéro de référence du ministère
5853-CWRJLU
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 23 novembre 2023 au 7 janvier 2024 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 23 novembre 2023
au 7 janvier 2024

Résumé de la proposition

The proposal is for a new Environmental Compliance Approval for industrial sewage treatment works for G. Tackaberry & Sons Construction Company Limited, to serve Sweet's Pit for an existing mobile aggregate wash water facility, located at 3299 Highway 32 in the Township of Leeds and the Thousand Islands, Ontario.

Détails de l'emplacement

Adresse du site

3299 Highway 32
Leeds and the Thousand Islands , ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

G. Tackaberry & Sons Construction Company Limited
109 Washburn Road
PO Box No. 70
Athens, ON
K0E 1B0
Canada

Détails de la proposition

The proposal is for a new Environmental Compliance Approval for industrial sewage treatment works for G. Tackaberry & Sons Construction Company Limited, to serve Sweet's Pit for an existing mobile aggregate wash water facility, located at 3299 Highway 32 in the Township of Leeds and the Thousand Islands, Ontario.

The wash plant consists of a source water pond approximately 60 metres wide and 110 metres long. The depth of the pond varies between 4.5 metres to 5.5 metres. Intake water for the wash plant is taken for aggregate washing as necessary in accordance with the rates and durations specified on Permit to Take Water No. 4360-ACUNG2 for the Sweet’s Pit.

The maximum water taking rate for the mobile wash plant is 7,855,200 liters per day for a maximum of 292 days per year. The water from the mobile wash plant is returned to the source pond via a settling channel approximately 45 metres long and 7 metres wide.

Flow within the settling channel is slowed by a gabion stone weir located at the point where the water re-enters the source water pond. The mobile wash plant operates as a closed-loop system with no direct discharge to the environment.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 23 novembre 2023