Prodigy Gold Inc. - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-7165
Numéro de référence du ministère
8140-CRRH73
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition
Proposition affichée
Période de consultation
Du 13 juin 2023 au 13 juillet 2023 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 13 juin 2023
au 13 juillet 2023

Résumé de la proposition

This proposal is for a new Permit to Take Water for Prodigy Gold Inc. Water will be taken for dewatering and industrial purposes as part of the Magino Mine project, located in the Township of Dubreuilville, Ontario.

Détails de l'emplacement

Adresse du site

21 Rue Des Pins
Dubreuilville, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Prodigy Gold Inc.
Post Office Box 209
Dubreuilville, ON
P0S 1B0
Canada

Détails de la proposition

This proposal is for a new Permit to Take Water for Prodigy Gold Inc. Water will be taken for dewatering and industrial purposes as part of the Magino Mine project, located in the Township of Dubreuilville, Ontario. Details of water taking are as follows:

Source name: open pit

  • purpose of water taking: dewatering
  • source of water: pond
  • maximum rate per minute (litres): 16,635
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 23,955,000
  • maximum number of days of taking in a year: 365
  • period of water taking: January 1 to December 31 for 10 years

Source name: Goudreau Lake

  • purpose of water taking: industrial
  • source of water: lake
  • maximum rate per minute (litres): 903
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 1,300,000
  • maximum number of days of taking in a year: 365
  • period of water taking: January 1 to December 31 for 10 years

Source name: Goudreau Lake

  • purpose of water taking: industrial
  • source of water: lake
  • maximum rate per minute (litres): 2,716
  • maximum number of hours of taking per day: 24
  • maximum volume (litres) per day: 3,912,000
  • maximum number of days of taking in a year: 3
  • period of water taking: March 31 to October 31 for 10 years

There are 3 categories of a Permit to Take Water:

  • Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
  • Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
  • Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference

The proposed water taking qualifies as a Category 3 permit.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 13 juin 2023
au 13 juillet 2023

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis