Update Announcement
This proposal was originally posted on July 8, 2024, with a 45 day comment period ending August 22, 2024.The notice incorrectly had the location of the activity as 795 River Road when it should have been 794 River Road. The notice has been updated to correct this typographical error.
This consultation was open from:
July 8, 2024
to August 22, 2024
Proposal summary
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) for G W Metal Mining Inc., a plastic, steel and e-waste shredding and recycling facility, located in the City of Pembroke, Ontario.
Location details
Site address
794 River Road
Pembroke,
ON
Canada
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
G W Metal Mining Inc.
794 River Road
Pembroke,
ON
K8A 1A6
Canada
Proposal details
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air & noise) which replaces all the current Environmental Compliance Approvals for Air at this facility and includes the addition of new or historically unapproved sources for all emissions from G W Metal Mining Inc., a plastic, steel and e-waste shredding and recycling facility, located in the City of Pembroke, Ontario.
The application includes all sources at the facility, including a natural gas boiler and six main processing lines for e-waste, plastic and cardboard materials, each with a dedicated dust collector. Emissions to the air from this facility include:
- nickel,
- cadmium,
- particulate matter,
- mercury,
- lead,
- manganese,
- phosphorus, and
- beryllium
The Environmental Compliance Approval with Limited Operational Flexibility (air & noise), when issued permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air & noise). The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from July 8, 2024
to August 22, 2024