This consultation was open from:
June 13, 2024
to July 13, 2024
Proposal summary
This proposal is for the renewal of Permit to Take Water No. 7413-9NUJHS for Vale Canada Limited for remediation purposes. Water will be taken from four wells and one pond located in Lively, District of Sudbury, Ontario.
Location details
Site address
175 INDUSTRIAL ROAD
Lively,
ON
Canada
Site location details
Copper Cliff Nickel Refinery
Site location map
The location pin reflects the approximate area where environmental activity is taking place.
View this location on a map opens link in a new windowProponent(s)
Vale Canada Limited
1500 - 200 Bay Street
RBP South Tower
Toronto,
ON
M5J 2K2
Canada
Proposal details
This proposal is for the renewal of Permit to Take Water No. 7413-9NUJHS for Vale Canada Limited for remediation purposes. Water will be taken from four wells and one pond located in Lively, District of Sudbury, Ontario. Details of Water Taking are as follows:
Permit type - renewal
Source Name: PW1
Purpose of water taking: remediation
- source of water: well - drilled
- total maximum rate (litres per minute): 24
- maximum number of hours of taking per day: 24
- total maximum volume (litres) per day: 34,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: PW2
Purpose of water taking: remediation
- source of water: well - drilled
- total maximum rate (litres per minute): 24
- maximum number of hours of taking per day: 24
- total maximum volume (litres) per day: 34,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: PW3
Purpose of water taking: remediation
- source of water: well - drilled
- total maximum rate (litres per minute): 24
- maximum number of hours of taking per day: 24
- total maximum volume (litres) per day: 34,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: PW4
Purpose of water taking: remediation
- source of water: well - drilled
- total maximum rate (litres per minute): 24
- maximum number of hours of taking per day: 24
- total maximum volume (litres) per day: 34,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
Source Name: Interception Trench
Purpose of water taking: remediation
- source of water: pond - dugout
- maximum rate (litres per minute): 394
- maximum number of hours of taking per day: 24
- maximum volume (litres) per day: 566,000
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- period of taking: 10 years
There are 3 Categories of a Permit to Take Water:
- Category 1: water takings are anticipated to have a lower risk of causing an unacceptable environmental impact/interference
- Category 2: water takings are anticipated to having a higher potential of causing unacceptable environmental impact or interference
- Category 3: water takings are anticipated to have the highest potential of causing unacceptable environmental impactor interference
The proposed water taking qualifies as a Category 1 permit.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comment
Commenting is now closed.
The comment period was from June 13, 2024
to July 13, 2024