This consultation was open from:
April 21, 2022
to June 5, 2022
Decision summary
We have issued a new Environmental Compliance Approval (M&P Sewage) for Sco-Terra Operations Group Inc. for mobile sewage treatment works designed for domestic sewage treatment, to service employment populations within the greenhouse sector in the Southwest Region of Ontario.
Location details
Site address
ON
Canada
Site location details
Mobile Wastewater Treatment Plant
Proponent(s)
Sco-Terra Operations Group Inc.
321 Dufferin Avenue
London,
ON
N6B 1Z3
Canada
Decision details
We have issued a new Environmental Compliance Approval (M&P Sewage) for Sco-Terra Operations Group Inc. for a Mobile Wastewater Treatment Facility (WWTF) and surface discharge system to service the employment population of greenhouse development, including accessory warehouse and office facilities, with staff residing on-site and off-site in the Southwest Region of Ontario.
The approved works involves a mobile moving bed biofilm reactor (MBBR) WWTF, including pretreatment facilities comprised of oil-grease interceptor, flow equalization, primary sedimentation, MBBR biological treatment for carbon oxidation and nitrification, sludge storage, alkalinity addition, pH adjustment, tertiary treatment including phosphorus removal through chemical precipitation, tertiary filtration and ultra violet disinfection, with effluent discharge to surface water.
The proposed WWTF is designed for implementation in 2 stages of 60 cubic metres per day, with a rated capacity of 120 cubic metres per day of domestic sewage generated by an employment population comprised of workers residing on-site and other staff residing off-site.
The WWTF is designed to achieve tertiary effluent quality for dry-ditch discharge to surface water receivers such as intermittent flow ditches and municipal drains.
Effects of consultation
No comments were received.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
This instrument decision can be appealed. You have 15 days from October 24, 2022 to begin the appeal process.
Carefully review the information below to learn more about the appeal process.
How to appealClick to Expand Accordion
Start the process to appeal
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
Sco-Terra Operations Group Inc.
321 Dufferin Avenue
London,
ON
N6B 1Z3
Canada
Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Include the following:
This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Original proposal
Proposal details
The proposal is for a new Environmental Compliance Approval (M&P Sewage) for Sco-Terra Operations Group Inc. for a Mobile Wastewater Treatment Facility (WWTF) and surface discharge system to service the employment population of greenhouse development, including accessory warehouse and office facilities, with staff residing on-site and off-site.
The project involves a mobile moving bed biofilm reactor (MBBR) wastewater treatment facility, including pretreatment facilities comprised of oil-grease interceptor, flow equalization, primary sedimentation, MBBR biological treatment for carbon oxidation and nitrification, sludge storage, alkalinity addition, pH adjustment, tertiary treatment including phosphorus removal through chemical precipitation, tertiary filtration and ultra violet disinfection, with effluent discharge to surface water.
The proposed WWTF is designed for implementation in 2 stages of 60 cubic metres per day, with a rated capacity of 120 cubic metres per day of domestic sewage generated by an employment population comprised of workers residing on-site and other staff residing off-site.
The WWTF is designed to achieve tertiary effluent quality for dry-ditch discharge to surface water receivers such as intermittent flow ditches and municipal drains.
Supporting materials
View materials in person
Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.
Get in touch with the office listed below to find out if materials are available.
Comment
Commenting is now closed.
This consultation was open from April 21, 2022
to June 5, 2022
Connect with us
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Comments received
Through the registry
0By email
0By mail
0