Dragados Canada Inc., general partner for and on behalf of Mosaic Transit General Partnership - Permit to take water

Instrument type: Permit to take water

ERO number
019-0266
Ministry reference number
1080-BD4SYZ
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Notice stage
Decision
Decision posted
Comment period
July 5, 2019 - August 4, 2019 (30 days) Closed
Last updated

This consultation was open from:
July 5, 2019
to August 4, 2019

Decision summary

This decision is for a new Permit to Take Water for construction dewatering along a section of the Finch Light Rail Transit line. Permit to Take Water No. 1184-BEFKAU was issued on September 19, 2019 for a period of four years.

Location details

Site address

Right of Way on Finch Road West (between west of Signet Drive to east of Tangiers Road)
Vaughan, ON
Canada

Site location map

The location pin reflects the approximate area where environmental activity is taking place.

View this location on a map opens link in a new window

Proponent(s)

Dragados Canada Inc., general partner for and on behalf of Mosaic Transit General Partnership
555 Hanlan Road
Suite 8
Vaughan, ON
L4L 4R8
Canada

CRH Canada Inc. general partner for and on behalf of Mosaic Transit General Partnership
555 Hanlan Road
Suite 8
Vaughan, ON
L4L 4R8
Canada

AECON Infrastructure Management Inc. general partner for and on behalf of Mosaic Transit General Partnership
555 Hanlan Road
Suite 8
Vaughan, ON
L4L 4R8
Canada

Decision details

This decision is for a new Permit to Take Water for construction dewatering purposes along a section of the Finch Light Rail Transit line. Permit to Take Water No. 1184-BEFKAU was issued on September 19, 2019 for a period of four years.

Details of the water taking are as follows:

Source of water – #1 (Signet to 400 and 400 MUPM)

  • purpose of waking: construction dewatering
  • period of water taking: 4 years
  • maximum rate per minute (litres): 1003
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 1,445,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31

Source of water – #2 (400 to Northfinch)

  • purpose of taking: construction dewatering
  • period of water taking: 4 years
  • maximum rate per minute (litres): 389
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 560,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31

Source of water – #3 (Northfinch to York Gate)

  • purpose of taking: construction dewatering
  • period of water taking: 4 years
  • maximum rate per minute (litres): 448
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 645,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31

Source of water – #4 (York Gate to Jane)

  • purpose of taking: construction dewatering
  • period of water taking: 4 years
  • maximum rate per minute (litres): 358
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 515,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31

Source of water – #5 (Jane to east of Tobermory)

  • purpose of taking: construction dewatering
  • period of water taking: 4 years
  • maximum rate per minute (litres): 2042
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 2,940,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31

Source of water – #6 (east of Tobermory to Alexdon)

  • purpose of taking: construction dewatering
  • period of water taking: 4 years
  • maximum rate per minute (litres): 1979
  • maximum number of hours of taking per day: 24
  • maximum volume per day (litres): 2,850,000
  • maximum number of days of taking per year: 365
  • earliest calendar date of taking (mm/dd): 01/01
  • latest calendar date of taking (mm/dd): 12/31

Request a copy of the permit.

Comments received

Through the registry

0

By email

1

By mail

0
View comments submitted through the registry

Effects of consultation

No comments were received in response to the Environmental Registry proposal notice. However, as a result of the notification process, we received one request for additional information. We provided additional information about the application, including clarifying the location of the water taking.

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Drinking Water and Environmental Compliance Division - Central Region Office
Address

5775 Yonge Street
Floor 8
Toronto, ON
M2M 4J1
Canada

Office phone number

How to Appeal

This instrument decision can be appealed. You have 15 days from February 26, 2021 to begin the appeal process.

Carefully review the information below to learn more about the appeal process.

How to appealClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Issuing authority
Ellen Klupfel
Supervisor (Acting)

Central Region
119 King St W
Floor 12
Hamilton, ON
L8P 4Y7
Canada

437-216-5233

Proponent(s)

Dragados Canada Inc., general partner for and on behalf of Mosaic Transit General Partnership
555 Hanlan Road
Suite 8
Vaughan, ON
L4L 4R8
Canada

CRH Canada Inc. general partner for and on behalf of Mosaic Transit General Partnership
555 Hanlan Road
Suite 8
Vaughan, ON
L4L 4R8
Canada

AECON Infrastructure Management Inc. general partner for and on behalf of Mosaic Transit General Partnership
555 Hanlan Road
Suite 8
Vaughan, ON
L4L 4R8
Canada


Appellate body

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Include the following:

ERO number
019-0266
Ministry reference number
1080-BD4SYZ

This is not legal advice. Please refer to the Environmental Bill of Rights for exact legal requirements. Consult a lawyer if you need help with the appeal process.

Connect with us

Contact

Sign up for notifications

We will send you email notifications with any updates related to this consultation. You can change your notification preferences anytime by visiting settings in your profile page.

Follow this notice

Original proposal

ERO number
019-0266
Ministry reference number
1080-BD4SYZ
Notice type
Instrument
Act
Ontario Water Resources Act, R.S.O. 1990
Posted by
Ministry of the Environment, Conservation and Parks
Proposal posted

Comment period

July 5, 2019 - August 4, 2019 (30 days)

Proposal details

Description of instrument

This proposal is for a new Permit To Take Water for Dragados Canada Inc., CRH Canada Inc. and AECON Infrastructure Management Inc. for and on behalf of Mosaic Transit General Partnership for construction purposes.

Water will be taken from one well (1) for construction dewatering along a section of the Finch Light Rail Transit line.

Details of the water taking are as follows.

Source of Water – Part D Alignment

  • Purpose of Taking: Construction dewatering
  • Period of Water Taking: 4 Years
  • Maximum rate per minute (Litres): 9,780
  • Maximum number of hours of taking per day: 24
  • Maximum volume per day (Litres): 13,980,000
  • Maximum number of days of taking per year: 365
  • Earliest calendar date of taking (mm/dd): 01/01
  • Latest calendar date of taking (mm/dd): 12/31

Supporting materials

View materials in person

Some supporting materials may not be available online. If this is the case, you can request to view the materials in person.

Get in touch with the office listed below to find out if materials are available.

Drinking Water and Environmental Compliance Division - Central Region Office
Address

5775 Yonge Street
Floor 8
Toronto, ON
M2M 4J1
Canada

Office phone number

Comment

Commenting is now closed.

This consultation was open from July 5, 2019
to August 4, 2019

Connect with us

Contact

Permit to take water coordinator (Central region)

Phone number
Office
Drinking Water and Environmental Compliance Division - Central Region Office
Address

5775 Yonge Street
Floor 8
Toronto, ON
M2M 4J1
Canada

Office phone number