BVD Holdings Caledon Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-6191
Numéro de référence du ministère
7056-CKAJHZ
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 28 octobre 2022 au 12 décembre 2022 (45 jours) Fermé
Dernière mise à jour

Update Announcement

This proposal notice has been updated on February 27, 2024, to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.

Cette consultation a eu lieu :

du 28 octobre 2022
au 12 décembre 2022

Résumé de la proposition

The proposal is for a new Environmental Compliance Approval for industrial stormwater management works and the establishment of year-round subsurface sewage disposal works, rated at 20,850 litres per day, to service 14027 Hurontario Street in the Town of Caledon, Ontario.

Détails de l'emplacement

Adresse du site

14027 Hurontario Street
Caledon, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

BVD Holdings Caledon Inc.
130 Delta Park Boulevard
Brampton, ON
L6T 5E7
Canada

Détails de la proposition

The proposal is for a new Environmental Compliance Approval for industrial stormwater management works and the establishment of year-round subsurface sewage disposal works, rated at 20,850 litres per day, to service a proposed gas bar, convenience store, and mixed commercial use, located at 14027 Hurontario Street in the Town of Caledon, Ontario.

The proposed works include:

  • septic tanks
  • a package treatment system
  • a subsurface disposal bed

The ministry may require effluent monitoring and may impose effluent limits.

The stormwater management works comprise of stormwater quality control, quantity control, and erosion control works, and include:

  • on-site storm sewers
  • rooftop and surface storage
  • a stormwater management dry pond
  • an oil and grit separator

The stormwater management works will discharge to existing storm sewers located along King Street.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 28 octobre 2022
au 12 décembre 2022

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis