Update Announcement
This proposal notice has been updated on February 27, 2024, to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 26 août 2022
au 10 octobre 2022
Résumé de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for Netherlands Reformed Congregation at Hamilton for sewage works serving Netherland Reformed Congregation, located at 68 Bethel Road in Paris, Ontario.
Détails de l'emplacement
Adresse du site
68 Bethel Road
Paris,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Netherlands Reformed Congregation at Hamilton
68 Bethal Road
Brant,
ON
N3L 3E3
Canada
Détails de la proposition
This proposal is for a new Environmental Compliance Approval (sewage) for Netherlands Reformed Congregation at Hamilton for sewage works serving Netherland Reformed Congregation.
This proposal is for the approval of storm sewers and stormwater management works to serve an addition to an existing facility located at 68 Bethel Road, Paris, Ontario.
The proposed stormwater management works consist of subsurface infiltration chambers, and will discharge to existing roadside ditch located along Bethel Road.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 26 août 2022
au 10 octobre 2022