Cette consultation a eu lieu :
du 29 avril 2022
au 29 mai 2022
Résumé de la décision
The Director of Exploration has made a decision on the exploration permit application PR-22-000095 to Patrick Culhane for early exploration activities, in Melba and Benoit townships, approximately 25 kilometers north west of the town of Kirkland Lake.
The decision is to issue the mineral exploration permit.
Détails de l'emplacement
Détails de l'emplacement du site
The exploration activities are located, in Melba and Benoit townships, approximately 25 kilometres north west of the town of Kirkland Lake.
Claim numbers instructions: “To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.”
Claim numbers: 525015, 525016, 525017, 525018, 539384, 539385, 539430, 539652, 540190, 540191, 540192, 550078, 550476, 550477, 550478, 550479, 550480, 550670, 550671, 550905, 562780, 569624, 569625, 569626, 569627, 569628, 630016, 630017, 630018, 630019, 682536, 682537, 682538, 682539, 682540, 682541, 682542, 682543, 682544, 682545, 682546, 682547, 682548, 682549, 682550, 682551, 682552, 682553, 682554, 682555, 682556, 682557, 682558, 682559, 682560, 682561, 682562, 682563, 682564, 682565, 682566, 682567, 682568, 682569, 682570, 683027, 683028, 683029, 683030, 683031, 683032
Lease numbers instructions: “To view individual claims on a map please use the Mining Lands Administration System. Click on “Search by Location” and select “Mining Lease” to search by lease numbers or “Find a township” to search by township.”
Lease number: LEA-109680
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Patrick Albert Culhane
255 Kenogami Lane
Box 361
Kirkland Lake,
ON
P2N 3J1
Canada
Détails de la décision
On June 17, 2022 the ministry issued the proposed early exploration permit.
This permit will allow the company to conduct:
- mechanized drilling (where the drill weight is greater than 150 kilograms)
- mechanized stripping (greater than 100 square metres in a 200 metres radius)
- pitting and trenching
- line cutting
The exploration permit was issued once all Indigenous communities and the public had the opportunity to provide comment or raise their concerns. The Exploration Permit duration will be up to 3 years with the possibility of renewal.
Effets de la consultation
No comments were received through the Environmental Registry of Ontario resulting in no impact on the decision whether or not to proceed with this proposal.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
How to Appeal
Les appels ne sont pas autorisés
Ce type d’acte ne peut être porté en appel. En savoir plus sur notre processus de consultation.
Communiquer avec nous
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Proposition initiale
Détails de la proposition
Patrick Culhane has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.
The activities that this permit would allow the company to carry out are as follows:
- mechanized drilling (where the drill weight is greater than 150 kilograms)
- mechanized stripping (greater than 100 square metres in a 200 metres radius)
- pitting and trenching.
- line cutting.
The potential disturbance from the activities are described as:
Line cutting (greater than 1.5 metres in width): is done to prepare an area of mineral potential for further geological or geophysical activities. The potential environmental disturbance includes (but are not limited to): cutting trees and vegetation greater than 1.5 metre corridor with an axe, machete or chainsaw, clearing underbrush, and driving wood pickets into the ground.
Mechanized surface stripping: uses heavy equipment to remove vegetation and soil (overburden) from bedrock. The potential environmental disturbance includes (but are not limited to): use of heavy equipment such as bulldozers, backhoes, excavators or forest harvest equipment, to remove soil from the bedrock, washing the bedrock by pumping water from nearby lakes, rivers or streams, and creation of access trails.
Pitting and trenching: are conducted to gain a greater visual understanding of the rock. The potential environmental disturbance includes (but is not limited to): the removal of surface soil, exposed rock as well as excavation or blasting of rock leaving shallow holes or trenches that vary in depth and length from the use of heavy equipment.
Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.
Proponents are required to follow provincial standards for early exploration to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives (see links in “Related links” section).
This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.
An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
5520 Highway 101 E Highway
PO Box 3060
South Porcupine Ontario,
ON
P0N 1H0
Canada
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 29 avril 2022
au 29 mai 2022
Communiquer avec nous
Contact
Andrew Persad
5520 Highway 101 East
PO Box 3060
South Porcupine,
ON
P0N 1H0
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0