Hacienda North Farms Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-5335
Numéro de référence du ministère
4223-CCCKCB
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 8 avril 2022 au 9 mai 2022 (31 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 8 avril 2022
au 9 mai 2022

Résumé de la décision

A new amended Environmental Compliance Approval is granted to Hacienda North Farms Inc. for stormwater management works serving the greenhouse site (phases 1, 2 & 3) located at 20968 Coatsworth Road, in the Municipality of Chatham-Kent, Ontario.

Détails de l'emplacement

Adresse du site

2961 Talbot Trail
Wheatley, ON
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Hacienda North Farms Inc.
2961 Talbot Trail
Wheatley, ON
N0P 2P0
Canada

Détails de la décision

A new amended Environmental Compliance Approval is granted to Hacienda North Farms Inc. for stormwater management works serving the Phase 3 greenhouse expansion site located at 2961 Talbot Trail,Lot 193, Concession Romney Talbot Road West, in the Municipality of Chatham-Kent, Ontario, together with existing stormwater management works serving Phases 1 & 2 greenhouses.

The approved facilities consist of the following:

  • roof water drainage pipe systems, swales and on-site storm sewers, discharging roof top runoff and other surface runoff to the stormwater detention ponds
  • stormwater management pond (catchment area 18.215 ha): stormwater management pond located at the north west corner of the property (serving Phases 1 and 2)
  • the Phase 1 and 2 stormwater management facility is:
    • designed to contain the 1:100 year storm event providing a pond storage volume of 21,273.60 cubic meters with a maximum water depth of 2.506 meters and a release rate of 796.0 litres per second
    • complete with a 304 millimeter freeboard and a 750 millimeter diameter outlet pipe and an emergency spillway, discharging into the Coatsworth-Robinson Extension Drain post-development peak flows for all storm events up to and including the 100-year return storm event
  • one oil/grit separator, receiving discharge from approximately 0.55 hectare parking lot, having:
    • a sediment capacity of 1,000 litres
    • oil capacity of 500 litres
    • a total holding capacity of 1,500 liltres
    • a maximum treatment flow rate of 24 litres per second
    • discharge via sewers into the stormwater detention pond of the Phases 1 & 2 described above
  • the Phase 3 stormwater management facility located near the East property limit that has:
    • a storage volume of 10,826.80 cubic meters with a maximum water depth of 1.98 meters and a release rate of 1078.0 liters per second
    • a 370 millimeter freeboard and a 600 millimeter diameter outlet pipe and outlet structure discharging into Lake Erie
    • an emergency spillway available to allow discharging into the east line ditch

Commentaires reçus

Par l'entremise du registre

0

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

No comments were received.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St. Clair Avenue West
Floor 1
Toronto, ON
M4V 1P5
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 31 octobre 2022 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

Start the process to appeal

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Fariha Pannu
Manager

Environmental Assessment and Permissions Branch
1st Floor, 135 St Clair Ave W
Toronto, ON
M4V 1P5
Canada

416-314-7092

Proponent(s)

Hacienda North Farms Inc.
2961 Talbot Trail
Wheatley, ON
N0P 2P0
Canada


Organe d’appel

Registrar, Ontario Land Tribunal
655 Bay Street, Suite 1500
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Ontario Land Tribunal


Inclure les éléments suivants:

Numéro du REO
019-5335
Numéro de référence du ministère
4223-CCCKCB

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-5335
Numéro de référence du ministère
4223-CCCKCB
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

8 avril 2022 - 9 mai 2022 (31 days)

Détails de la proposition

This proposal is for an amendment to Environmental Compliance Approval No. 9565-AP8QCB for stormwater management works to serve the Hacienda North Farms Phase 3 Greenhouse Expansion, located at 2961 Talbot Trail in Wheatley, Ontario.

The stormwater management facilities consist of the following:

  • Roof water drainage pipe systems, swales and on-site storm sewers, discharging roof top runoff and other surface runoff to the stormwater detention ponds.
  • Stormwater management pond located at the north west corner of the property serving Phases 1 and 2, designed to contain the 1:100 year storm event providing a pond storage volume of 21,273.60 cubic meters with a maximum water depth of 2.506 meters and a release rate of 796.0 litres per second. This facility is complete with a 304 millimeter freeboard and a 750 millimeter diameter outlet pipe and an emergency spillway, discharging into the Coatsworth-Robinson Extension Drain located along the 2nd Concession Line.
  • Phase 3 contains approximately 15.23 hectares of greenhouse roof area, to attenuate post-development peak flows for all storm events up to and including the 100-year return storm event. The Phase 3 stormwater management facility is located near the East property limit provides a storage volume of 10,826.80 cubic meters with a maximum water depth of 1.98 meters and a release rate of 1078.0 liters per second. This facility is complete with a 370 millimeter freeboard and a 600 millimeter diameter outlet pipe and outlet structure discharging into Lake Erie. In addition, an emergency spillway is available to allow discharging into the east line ditch.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 8 avril 2022
au 9 mai 2022

Communiquer avec nous

Contact