Cette consultation a eu lieu :
du 11 mars 2022
au 25 avril 2022
Résumé de la décision
GFL requested to withdraw the application for an Environmental Compliance Approval (sewage). The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
17125 Laflèche Road
North Stormont,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
GFL Environmental Inc.
17125 Lafleche Road
North Stormont,
ON
K0C 1W0
Canada
Détails de la décision
GFL requested on December 6, 2022 to withdraw the application as they needed more time to complete the consultation with the ministry's Technical Support Section and then resubmit the application at a later date.
The ministry closed the file on January 5, 2023, and no approval was issued.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an amendment to the existing Environmental Compliance Approval No. 2592-B83KSN to construct stormwater management (SWM) works that will capture runoff from the re-located compost curing and storage areas. GFL Environmental Inc. owns and operates the Eastern Ontario Waste Handling Facility Landfill and Composting site, located at 17125 Lafleche Road in the Township of North Stormont, Ontario.
This amendment includes:
- a stormwater management wet pond
- a stormwater detention pond
- leaf and yard retention pond
- associated drainage ditches
The works will capture run-off from a total area of 28 hectares, and will have a single discharge outlet to the Albert Fahey Award Drain.
Design criteria for water quantity control and water quality are in accordance with the Ministry of Environment, Conservation and Parks' standards and guidelines.
Construction of the SWM works is anticipated to commence in Summer 2022 and become operational before the end of 2022.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 11 mars 2022
au 25 avril 2022
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0