Update Announcement
This proposal notice has been updated on February 28, 2024 to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 12 janvier 2022
au 26 février 2022
Résumé de la proposition
This proposal is for an amendment to Environmental Compliance Approval No. A371203 for Waste Management of Canada Corporation to incorporate a Contaminant Attenuation Zone, to update the environmental monitoring plan, and to incorporate a hydraulic control system at the WM Richmond Landfill site, located in the Town of Greater Napanee, Ontario.
Détails de l'emplacement
Adresse du site
1271 Beechwood Road
Lots 1, 2 and 3, Concession 4, Richmond
Greater Napanee ,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Waste Management of Canada Corporation
1271 Beechwood Road
Napanee,
ON
K7R 3L1
Canada
Détails de la proposition
The purpose of this amendment to existing Waste Disposal Site Environmental Compliance Approval No. A371203 (the ECA) is to:
- incorporate a Contaminant Attenuation Zone (CAZ) for the WM Richmond Landfill (the site)
- update the environmental monitoring plan (EMP) for the site
- incorporate a hydraulic control system (HCS)
This amendment is the result of a December 2015 decision by the Environmental Review Tribunal that required WM to demonstrate delineation of leachate-impacted groundwater at the site, and off-site.
In 2021, the Ministry of the Environment, Conservation and Parks (MECP) confirmed that the extent of leachate-impacted groundwater related to the site had been delineated and therefore this amendment is submitted to address non-compliance with the ECA and the MECP’s Guideline B-7. The proposed CAZ incorporates land south of the Landfill footprint and Beechwood Road and updates the EMP for the site accordingly (i.e. adjusts the monitoring locations and programs as per the new CAZ).
The amendment also incorporates a hydraulic control system (HCS) to address established leachate-impact to the east of the site. The objective is to hydraulically control off-site migration of landfill leachate impacted groundwater in the intermediate bedrock flow zone, while minimizing the volume of extracted groundwater. The HCS will include:
- three groundwater extraction wells open in the intermediate bedrock flow zone
- discharge pipe from the extraction wells to existing Stormwater Pond No. 3
- controls and monitoring including water levels in each extraction well and measurement of cumulative groundwater extraction rate
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 12 janvier 2022
au 26 février 2022