Update Announcement
This proposal notice has been updated on February 28, 2024 to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.
Cette consultation a eu lieu :
du 22 novembre 2021
au 6 janvier 2022
Résumé de la proposition
This proposal is for an amendment to Environmental Compliance Approval No. 5291-9X3NDV for Jones Group Ltd. for the processing of excess soil and soil slurries at the facility located at 7809 Howard Avenue in McGregor, Ontario.
Détails de l'emplacement
Adresse du site
7809 Howard Avenue
McGregor,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Jones Group Ltd.
7809 Howard Avenue
Amherstburg,
ON
N0R 1J0
Canada
Détails de la proposition
The Jones Group Ltd. owns the combined contractor’s yard and waste management facility located at 7809 Howard Avenue in McGregor (Amherstburg), Ontario.
The facility operates with Environmental Compliance Approval No. 5291-9X3NDV for the receipt and processing of solid non-hazardous construction and demolition waste and other scrap metals up to 327 tonnes per day on a 7.5 hectare property.
Total waste and processed materials, including clean wood for grinding and stockpiling, scrap metal sorting and stockpiling, and concrete and asphalt receiving, sorting, crushing, screening and stockpiling, does not exceed 35,000 tonnes at any time.
The Jones Group Ltd. has applied for a minor technical amendment for a waste processing site (other than hazardous/liquid industrial) to receive and process excess soil and soil slurries from local sources and ongoing construction, demolition, infrastructure, and repair projects.
A maximum of 300 tonnes per day of incoming excess soil and soil slurries will be processed by gravity drainage, turning, soil mixing, and blending from an inclined gravel pad underlain by compacted native clayey soil with a maximum of 40,000 tonnes stockpiled at any time.
Incoming and processed excess soil bulk quality testing is completed in consideration of beneficial reuse at destination properties. Shallow groundwater quality is monitored on a quarterly basis from locations in proximity to facility operations, and surface water quality monitoring is completed at prescribed locations and frequency in compliance with the industrial sewage works Environmental Compliance Approval requirements, as input toward whether facility operations impact the surrounding natural environment.
The Facility serves the Province of Ontario and operates Monday to Friday from 7 a.m. to 6 p.m.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 22 novembre 2021
au 6 janvier 2022