Appeal of Minaki on the River Inc. - Environmental Compliance Approval (sewage)

Numéro du ERO
013-4986
Étape de l'avis
Appel
Appel publié
Dernière mise à jour

Résumé de l'appel

This notice was prepared by the applicant seeking leave to appeal and represents its position.

The decision of the Ministry of the Environment, Conservation and Parks to issue Amended Environmental Compliance Approval 7133-BCPLA4 to Minaki on the River on March 6, 2020

Détails de l’appel

Alex Rheault is seeking leave to appeal this decision. For additional details, see Environmental Review Tribunal Case No.: 20-019

This notice is given by the applicant in accordance with section 47 of the Environmental Bill of Rights, 1993. The notice was prepared by the applicant and represents its position. It does not represent or reflect the views of the Government of Ontario, nor does the Government of Ontario make any representations about the accuracy of the content of this notice.

Sewage treatment plants are heavily regulated precisely because their failure to perform can cause immediate and significant environmental harm.

The risk of harm is heightened in the case of the Minaki treatment plant, where effluent from the plant flows out a short pipe directly into the Winnipeg River, and where the plant is in unorganized territory, with no municipal oversight of plant operation or backup after plant failure. 

The refusal of the Ministry to follow its own rules and require updated water quality baseline studies for the Winnipeg River leaves the risk that the plant's treatment limits are inconsistent with the River's current condition, and that stricter limits and additional treatment are needed to avoid unacceptable degradation of water quality.

Furthermore, tertiary sewage filtration techniques are readily available and typically used which, if added to the Minaki plant, would further improve effluent quality in any event. 

The refusal of the Ministry to require additional filtration before discharge of effluent directly into the Winnipeg River results in a level of contamination of the River that could easily be avoided and that immediately and certainly worsens River water quality.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Communiquer avec nous

Personne-ressource

L’organe d’appel peut fournir davantage d’informations, notamment des dates et des lieux d’audience. Des informations supplémentaires sur le processus d'appel en vertu d'instruments peuvent être fournies par le ministère de l'Environnement, de la Conservation et des Parcs.

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Ministry of the Environment, Conservation and Parks
Environmental Bill of Rights Office
40 St. Clair Ave. West
12th Floor
Toronto, ON
M4V 1M2

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Appeal of Minaki on the River Inc. - Environmental Compliance Approval (sewage)

Numéro du ERO
013-4986
Étape de l'avis
Appel
Appel publié
Dernière mise à jour

Résumé de l'appel

This notice was prepared by the applicant seeking leave to appeal and represents its position.

The decision of the Ministry of the Environment, Conservation and Parks to issue Amended Environmental Compliance Approval 7133-BCPLA4 to Minaki on the River on March 6, 2020.

Détails de l’appel

Alex Rheault is seeking leave to appeal this decision. For additional details, see Environmental Review Tribunal Case No.: 20-019

This notice is given by the applicant in accordance with section 47 of the Environmental Bill of Rights, 1993. The notice was prepared by the applicant and represents its position. It does not represent or reflect the views of the Government of Ontario, nor does the Government of Ontario make any representations about the accuracy of the content of this notice.

Sewage treatment plants are heavily regulated precisely because their failure to perform can cause immediate and significant environmental harm.

The risk of harm is heightened in the case of the Minaki treatment plant, where effluent from the plant flows out a short pipe directly into the Winnipeg River, and where the plant is in unorganized territory, with no municipal oversight of plant operation or backup after plant failure.

The refusal of the Ministry to follow its own rules and require updated water quality baseline studies for the Winnipeg River leaves the risk that the plant's treatment limits are inconsistent with the River's current condition, and that stricter limits and additional treatment are needed to avoid unacceptable degradation of water quality.

Furthermore, tertiary sewage filtration techniques are readily available and typically used which, if added to the Minaki plant, would further improve effluent quality in any event.

The refusal of the Ministry to require additional filtration before discharge of effluent directly into the Winnipeg River results in a level of contamination of the River that could easily be avoided and that immediately and certainly worsens River water quality.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Communiquer avec nous

Personne-ressource

L’organe d’appel peut fournir davantage d’informations, notamment des dates et des lieux d’audience. Des informations supplémentaires sur le processus d'appel en vertu d'instruments peuvent être fournies par le ministère de l'Environnement, de la Conservation et des Parcs.

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Ministry of the Environment, Conservation and Parks
Environmental Bill of Rights Office
40 St. Clair Ave. West
12th Floor
Toronto, ON
M4V 1M2

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis


Original decision

Minaki on the River Inc. - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
013-4986
Numéro de référence du ministère
6643-B9MM8A
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision Appel
Décision publiée
Période de consultation
Du 28 mars 2019 au 12 mai 2019 (45 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 28 mars 2019
au 12 mai 2019

Résumé de la décision

An amended Environmental Compliance Approval was granted to Minaki on the River Inc. for the existing sewage works to serve the proposed seasonal recreational vehicle sites.

Détails de l'emplacement

Adresse du site

1 Western Avenue
Kenora, ON
P0X 1J0
Canada

Détails de l'emplacement du site

Unsurveyed Territory (Kenora Area Office)

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Minaki on the River Inc.
8 Brandt Street
Post Office Box Delivery 26
Steinbach, MB
R5G 1Y2
Canada

Détails de la décision

The application to change the serving area from the originally approved condominium type of development revised now to a seasonal recreational type of development was reviewed and deemed to be satisfactory.

Commentaires reçus

Par l'entremise du registre

4

Par courriel

0

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

The existing sewage works were inspected on October 2018 by a professional engineer with a consulting engineering firm in presence of representatives of the Owner and the Ministry. No equipment or structure failure was observed. The approval also has conditions imposed regarding preparation of a statement by a professional engineer that the sewage works have been restarted in accordance with the approval, and the preparation of as-built drawings within 6 months of start up of the sewage works. Any deficiencies in the sewage works have or will be rectified prior to startup of the sewage works. There is no change in the quantity of quality of raw sewage influent to the sewage treatment plant, treated effluent discharged to the receiver or there has been no change in the treated effluent discharge location.

The site is located within an unorganised area hence there is no municipal oversight. The site and all the structures, cabins and restaurant etc including the sewage works are existing. There are conditions imposed including the submission of Financial Assurance to the Ministry in case of a possible future default by the proponent.

Submission from legal counsel for Minaki on the River (MoR) indicate that the site is owned by three corporations which have identical Officers, Directors and Shareholders.

The sewage works have been previously deemed to be capable of meeting the stipulated effluent criteria imposed on the ECA and there should be no issues if the sewage works are operated by a licensed operator. The approval stipulates the requirement that the sewage works be operated by a licensed operator. MoR has noted that the Ontario Clean Water Agency (OCWA) will be contracted to operate the sewage treatment plant on their behalf. OCWA operates numerous sewage treatment plants in the Province and has competent and knowledgeable staff capable of operating the sewage treatment plant at MoR site.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number
Kenora Area Office (Environment, Conservation and Parks)
Address

808 Robertson Street
Kenora, ON
P9N 1X9
Canada

Office phone number

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 12 mars 2020 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Fariha Pannu
Manager

Environmental Assessment and Permissions Branch
1st Floor, 135 St Clair Ave W
Toronto, ON
M4V 1P5
Canada

416-314-7092

Proponent(s)

Minaki on the River Inc.
8 Brandt Street
Post Office Box Delivery 26
Steinbach, MB
R5G 1Y2
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
013-4986
Numéro de référence du ministère
6643-B9MM8A

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
013-4986
Numéro de référence du ministère
6643-B9MM8A
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

28 mars 2019 - 12 mai 2019 (45 days)

Détails de la proposition

Description of instrument

The proposal is for amendment of Environmental Compliance Approval (Municipal and Private Sewage Works) No. 7471-9LVPLH, issued on August 28, 2014 to Minaki on the River Inc. for an existing Sewage Treatment Plant (STP), located in Minaki, Ontario.

The existing sewage treatment plant was previously approved to serve a condominium type development. The Owner now intends the change the servicing from condominium development to a seasonal recreational vehicle trailer park, including a restaurant.

There are no changes to the existing sewage works, to the quantity or quality of the treated effluent nor the outlet discharge to the Winnipeg River.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number
Kenora Area Office (Environment, Conservation and Parks)
Address

808 Robertson Street
Kenora, ON
P9N 1X9
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 28 mars 2019
au 12 mai 2019

Communiquer avec nous

Contact