Cette consultation a eu lieu :
du 21 septembre 2021
au 5 novembre 2021
Résumé de la décision
Pure Metal Galvanizing ULC has withdrawn their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
32 Bodine Drive
Brantford,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Pure Metal Galvanizing ULC
32 Bodine Drive
Brantford,
ON
N3R 7M4
Canada
Détails de la décision
Pure Metal Galvanizing ULC has withdrawn their application for an Environmental Compliance Approval (air).
The application is considered withdrawn and no approval was issued. The ministry closed the file on November 1, 2022.
Effets de la consultation
One comment was received. The comment was reviewed but it didn’t have any impact on the decision because the application was withdrawn by the proponent. No approval was issued.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
1 Stone Road West
Floor 4
Guelph,
ON
N1G 4Y2
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an amendment to Environmental Compliance Approval (air & noise) No. 5956-8ZUQ3K with Limited Operational Flexibility for Pure Metal Galvanizing ULC, a facility that operates a hot-dip galvanizing process for corrosion protection of steel products, located in the City of Brantford, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include:
- three galvanizing kettles
- three dust collectors
- eleven hydrochloric acid descaling tanks
- three natural gas-fired furnaces
- two boilers
- other equipment and ancillary and support processes and activities
The amendment includes updates to:
- equipment
- emissions methodology
Emissions to the air from this facility include:
- suspended particulate matter
- hydrochloric acid
- ammonium chloride
- zinc
- products of combustion such as nitrogen oxides
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 21 septembre 2021
au 5 novembre 2021
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
1Par courriel
0Par la poste
0