Cette consultation a eu lieu :
du 12 août 2021
au 26 septembre 2021
Résumé de la décision
Bond Mary Development Phase II Inc. requested to withdraw their application for an Environmental Compliance Approval (industrial sewage). The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
80 Bond Street East
Oshawa,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Bond & Mary Development Phase II Inc.
1100 South Service Road
Unit 321
Stoney Creek,
ON
L8E 0C5
Canada
Détails de la décision
On July 12, 2022, Bond & Mary Development Phase II Inc. requested to withdraw their application for an Environmental Compliance Approval (industrial sewage) as the application falls under the new O. Reg. 525/98 exemption for an approval for foundation drainage works.
The application is considered withdrawn and no approval was issued. The ministry closed the file on July 15, 2022.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
The proposal is for a new Environmental Compliance Approval for sewage works, including the treatment of dewatered groundwater from a proposed residential development at 80 Bond Street East, Oshawa, Ontario.
The proposed works include the collection, treatment and discharge of groundwater to the nearby municipal sewer system.
The treatment system consists of:
- holding tanks
- filter bags
- treatment media and reagents
The effluent from the treatment system will meet the City of Oshawa’s sewer use bylaws. This proposal applies to the permanent groundwater dewatering system.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 12 août 2021
au 26 septembre 2021
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0