Cette consultation a eu lieu :
du 20 juillet 2021
au 3 septembre 2021
Résumé de la décision
Northern Sun Mining Corp. requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
Part 1300, 1301, and 1302, Plan 6R-3763
Timmins,
ON
P0N 1H0
Canada
Détails de l'emplacement du site
Redstone Mill
South Porcupine
Part 1300, 1301, and 1302, Plan 6R-3763
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Northern Sun Mining Corp.
Post Office Box 5114
South Porcupine,
ON
P0N 1H0
Canada
Détails de la décision
On May 13, 2022 , Northern Sun Mining Corp. requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued. The ministry closed the file on May 27, 2022.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an Environmental Compliance Approval with Limited Operational Flexibility (air), which replaces all the current Environmental Compliance Approvals for air at this facility, and includes the addition of new or historically unapproved sources for all emissions from Northern Sun Mining Corp. for the Redstone Mill, a mill processing nickel, copper, and gold ore, located in South Porcupine, Ontario.
The proposal includes all sources at the facility, including:
- milling
- crushing
- material handling
- a warehouse
- a core shack
- an electrical shop
- a mechanical shop
- any other equipment and ancillary and support processes and activities
Emissions to the air from this facility include:
- total suspended particulate
- arsenic
- cadmium
- chromium
- copper
- lead
- products of combustion such as nitrogen oxides
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that Page 2 time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 20 juillet 2021
au 3 septembre 2021
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0