Cette consultation a eu lieu :
du 8 juin 2021
au 23 juillet 2021
Résumé de la décision
ABB Industrial Solutions (Canada) Inc. requested to withdraw their application for an Environmental Compliance Approval (air). The application is considered withdrawn and no approval was issued.
Détails de l'emplacement
Adresse du site
1150 Walkers Line
Burlington,
ON
L7M 1V2
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
ABB Industrial Solutions (Canada) Inc.
1150 Walkers Line
Burlington,
ON
L7M 1V2
Canada
Détails de la décision
On November 8, 2021, ABB Industrial Solutions (Canada) Inc. requested to formally withdraw their application for an Environmental Compliance Approval (air).
The application is considered withdrawn and no approval was issued. The ministry closed the file on November 10, 2021.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
How to Appeal
Appeals are not allowed
As no decision was made, there is no decision to appeal.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for an amendment to the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 6339-AFBHAG for ABB Industrial Solutions (Canada) Inc., a facility that services and repairs electric motors, transformers and breakers, and other electrical equipment, located in the City of Burlington, Ontario.
The emission sources from the manufacturing and associated processes that exhaust to the air include painting, sand blasting, welding, and curing oven burn-off, as well as any other equipment and ancillary and support processes and activities.
The amendment includes the addition of a sub-slab depressurization soil vapour intrusion mitigation system to the site that will be operated by a third party.
Emissions to the air from this facility include calcium fluoride, ethylbenzene, hexavalent chromium, lead, and nickel.
The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air). The limited operational flexibility conditions have an expiry Page 2 date. The company will be required to make an application for amendment at that time to renew these conditions.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 8 juin 2021
au 23 juillet 2021
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0