Dean Maceachern Canadian Arrow Mines Limited - Mineral exploration permit

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Mineral exploration permit

Numéro du REO
019-3604
Numéro de référence du ministère
PR-21-000147
Type d'avis
Instrument
Loi
Mining Act, R.S.O. 1990
Affiché par
Ministry of Energy, Northern Development and Mines
Étape de l'avis
Ministry of Mines
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 5 mai 2021 au 4 juin 2021 (30 jours) Fermé
Dernière mise à jour

Update Announcement

This proposal notice is being updated to advise the public that the permit application is still under review and the Ministry has placed the application on Temporary Hold to allow for additional time to adequately consider any concerns. The original proposal date and comment period have not been altered. Temporary Hold is on going as of January 20, 2024

Cette consultation a eu lieu :

du 5 mai 2021
au 4 juin 2021

Résumé de la proposition

The Ministry is proposing to issue a permit to Canadian Arrow Mines Limited to undertake early exploration activities. The location of the activities is approximately 67 kilometres SE of Kenora Ontario, in Fisher Lake Area, District of Kenora, North West Region.

Détails de l'emplacement

Détails de l'emplacement du site

The mining activities are located approximately 67 kilometres South East of Kenora Ontario, in Fisher Lake Area, District of Kenora.

Claim numbers instructions: “To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.”

(Claim) numbers: 622235, 622238, 622239, 622240, 622241, 622242, 622245, 622246, 622247, 622248, 622249, 622252, 622253, 622254, 622255, 622258, 622259, 622260, 622263, 622264

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Dean Maceachern Canadian Arrow Mines Limited
Suite 1102 - 44 Victoria Ave
Toronto, ON
M5C1Y2
Canada

Détails de la proposition

Canadian Arrow Mines Limited has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow Canadian Arrow Mines Limited to carry out are as follows:

Plan activities:

  • geophysical survey requiring generator type

Permit activities:

  • line cutting (>1.5 metres width)

The potential disturbance from the activities are described as:

Line Cutting (greater than 1.5 metres in width): is done to prepare an area of mineral potential for further geological or geophysical activities. The potential environmental disturbance includes (but are not limited to): cutting trees and vegetation greater than 1.5 metres corridor with an axe, machete or chainsaw, clearing underbrush, and driving wood pickets into the ground.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.be up to 3 years with the possibility of one renewal for up to three years

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Mineral Development Office (Thunder Bay)
Address

435 James Street South
Suite B002
Thunder Bay, ON
P7E 6E3
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 5 mai 2021
au 4 juin 2021

Communiquer avec nous

Contact

Cameron McLean

Phone number
Office
Mines and Minerals Division-Resident Geologist Office: Thunder Bay
Address

435 James Street South
Suite B002
Thunder Bay, ON
P7E 6S7
Canada

Office phone number

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis