Cox Construction Limited - Permit to take water

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Permit to take water

Numéro du REO
019-3595
Numéro de référence du ministère
5026-BYWVCQ
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Décision
Décision publiée
Période de consultation
Du 5 mai 2021 au 4 juin 2021 (30 jours) Fermé
Dernière mise à jour

Cette consultation a eu lieu :

du 5 mai 2021
au 4 juin 2021

Résumé de la décision

A new Permit to Take Water No. 3713-C5BKY7 for Cox Construction Limited was issued on March 3, 2022 for aggregate washing purposes in the Township of Puslinch, Ontario.

Détails de l'emplacement

Adresse du site

6711 Laird Road
Puslinch, ON
Canada

Détails de l'emplacement du site

Lot 10, Concession 4

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Cox Construction Limited
965 York Road
Guelph, ON
N1H 6K5
Canada

Détails de la décision

A new Permit to Take Water (PTTW) No. 3713-C5BKY7 for Cox Construction Limited was issued on March 3, 2022, with an expiry date of December 31, 2025. Water will be taken from one dug pond located at 6711 Laird Road for aggregate washing purposes in the Township of Puslinch, Ontario. Cox Construction Ltd. is applying to amend the PTTW to move the source pond location to another location within the same lisenced gravel pit.

  • source of water: dugout pond
  • purpose of taking: industrial (aggregate washing)
  • maximum rate per minute (litres): 4,164.00
  • maximum number of hours of taking per day: 12
  • maximum volume per day (litres): 2,998,037.00
  • maximum number of days of taking: 228
  • earliest date of taking: April 01
  • latest date of taking: November 15
  • period of taking: 10 years

Request a copy of the permit.

Commentaires reçus

Par l'entremise du registre

0

Par courriel

2

Par la poste

0
Consulter les commentaires soumis par l'entremise du registre

Effets de la consultation

Comments from the city of Guelph

  1. The City is curious regarding the Ministry’s rational for the approval of an amendment to an existing PTTW for the relocation of a pond onto a separate legal property and at significant distance from the current wash pond. Climate Change
  2. Has the Grand River Conservation Authority (GRCA) been provided an opportunity to review the PTTW amendment application based on the location of the proposed new pond location being immediately south of a Regulated GRCA area and wetland?
  3. The City would recommend that water levels continue to be monitored in both the pond and the wetland including adjacent new monitoring wells, stream elevations and baseflows to ensure the wetland conditions are not being impacted by dewatering and/or the new wash pond (if permitted by the ARA License).
  4. The Aggregate Resources Act (ARA) License (2018) for the pit states: “14. When the processing area is relocated to Stage 3, the siltation pond will be relocated as well additional approvals, if required, will be obtained prior to relocation
  5. Could the Ministry confirm that the new pond location is permitted through the ARA License and that “No new approvals are required”?
  6. The City strongly recommends that monitoring of water levels continue with the existing requirements in the PTTW, especially because there were no additional assessments as to the potential impact of the new pond placement or construction beyond a desktop review.
  7. Please advise Cox Construction that they may be subject to the water quantity policies and the policies may affect the terms and conditions of their permit in the future.  Cox can obtain more information on the water quantity policy process at - https://www.sourcewater.ca/en/source-protection-areas/Guelph-and-Guelph-Eramosa-Tier-3.aspx?_mid_=1507.  
  8. Because this PTTW is within the WHPA-Q, the City requests that the Ministry include a condition within the permit to provide the annual monitoring reports from Cox Construction to the City for review.
  9. The Ministry has indicated that the consumptive use was estimated at 5 percent. Could the Ministry provide the basis for this estimate? The Ministry of Natural Resources/Ministry of the Environment Water Budget and Water Quantity Risk Assessment Guide (Drinking Water Source Protection Program, October, 2011) indicates a consumptive use factor of 15 percent for aggregate washing.
  10. If this permit is amended, please provide us with a copy of the new permit for our files.

Comments from Wellington Source Water Protection

  1. That the Ministry consider the impacts of the proposed taking to the Significant Groundwater Recharge Area.
  2. That the Ministry consider the draft WHPA-Q policy being developed as part of the Grand River Source Protection Plan.
  3. That the Ministry consider the addition of low water response conditions to all Permits to Take Water within the Township of Puslinch, where appropriate.

Response

Consideration of comments from the city of Guelph

  1. The amendment application is for the same purpose and same undertaking at the same quarry site. A Permit to Take Water may be used to cover multiple sites or properties used for the same undertaking.
  2. The GRCA has reviewed the amendment application with no comments.
  3. Note that the amended permit includes provisions requiring the proponent to install two new monitoring wells to the west of Sideline 10 North and within 500 meters of the relocated wash pond. If drawdown of a magnitude sufficient to impact adjacent natural features were to be detected at these monitoring wells, as identified in reporting, the director has the ability to amend the permit to alter the water taking rates or durations, or the associated monitoring requirements, in accordance with the adaptive management principles outlined in the Ministry’s Statement of Environmental Values.
  4. We understand the applicant to have applied for an amendment of their ARA license and Site Plan, however, we cannot confirm the status of approvals within the jurisdiction of the Ministry of Northern Development, Mines, Natural Resources and Forestry. Note that Condition 2.2 of the permit states that issuance of this Permit does not relieve the Permit Holder or any other person from any obligation to comply with any other applicable legal requirements. A note has also been appended to Table A which reads: Prior to any water taking under this Permit, the Permit Holder shall ensure that all necessary approvals under the Aggregate Resources Act have been obtained for wash pond operations and are reflected in the Site Plan
  5. See response to previous, above.
  6. Note that the amended permit includes provisions requiring the proponent to install two new monitoring wells to the west of Sideline 10 North and within 500 meters of the relocated wash pond. Monitoring at the site will not be discontinued. If drawdown of a magnitude sufficient to impact adjacent natural features were to be detected at these monitoring wells, as identified in reporting, the director has the ability to amend the permit to alter the water taking rates or durations, or the associated monitoring requirements, in accordance with the adaptive management principles outlined in the Ministry’s Statement of Environmental Values.
  7. The applicant has been made aware that the site falls within the Guelph-Guelph/Eramosa Township Well Head Protection Area Quantity - GGET WHPA-Q and that water quantity policies for this area are currently under development.
  8. The Ministry has included a condition that the permit holder will provide an annual monitoring report to the City of Guelph starting in April 30, 2023. 
  9. This estimate comes from a 2006 Water Consumption Study by Golder Associates, a report that is commonly referenced in aggregate washing PTTW applications. In addition to this estimate, 8 years of monitoring at the current wash pond location (observation wells and wash pond levels) have been completed and no impacts have been observed over that period.
  10. The issued permit was provided to the City of Guelph.

Consideration of Wellington Source Water Protection Comments

The Ministry included conditions requiring new monitoring well locations be installed within 500 meters of the new wash pond and water levels in the observation wells shall be measured and recorded on a continuous basis using dataloggers during the dewatering activities and continuing until one week after dewatering activities have ceased.

Given the very low consumptive use values associated with this water taking (estimated at 5%), and the fact that the wash pond source is not connected to any watercourses or online waterbodies, the Ministry does not believe conditions referencing the Low Water Response levels would provide additional benefit proportionate with the burden to the permit holder in this instance. We note that the Low Water Response Program does not require conditions to be in a PTTW in order to advise or compel permit holders to reduce their water taking volumes during a confirmed low water condition.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

How to Appeal

Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 28 mars 2022 pour entamer le processus d’appel.

Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.

Comment interjeter appelClick to Expand Accordion

For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.

Appeal process for decisions published before June 1, 2021

If you’re an Ontario resident, you can start the process to appeal this instrument decision.

First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.

If the appellate body grants leave, the appeal itself will follow.

Seek leave to appeal

To seek leave to appeal, you need to do these three things:

  1. prepare your application
  2. provide notice to the minister
  3. mail your application to three parties

1. Prepare your application

You’ll need to prepare an application. You may wish to include the following things in your application:

  1. A document that includes:
    • your name, phone number, fax number (if any), and/or email address
    • the ERO number and ministry reference number (located on this page)
    • a statement about whether you are a resident in Ontario
    • your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
    • the parts of the instrument that you’re challenging
    • whether the decision could result in significant harm to the environment
    • the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
    • the grounds (facts) you’ll be using to appeal
    • the outcome you’d like to see
  2. A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
  3. Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered

The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:

  1. is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
  2. could the decision you wish to appeal result in significant harm to the environment?

2. Provide your notice

You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.

In your notice, please include a brief description of the:

  • decision that you wish to appeal
  • grounds for granting leave to appeal

You can provide notice by email at minister.mecp@ontario.ca or by mail at:

College Park 5th Floor, 777 Bay St.
Toronto, ON 
M7A 2J3

3. Mail your application

You’ll need to mail your application that you prepared in step #1 to each of these three parties:

  • appellate body
  • issuing authority (the ministry official who issued the instrument)
  • proponent (the company or individual to whom the instrument was issued)

Autorité compétente
Neil Taylor
Permit to Take Water Surface Water Specialist

Environmental Permissions Branch
135 St Clair Avenue West
Toronto, ON
M4V 1P5
Canada

416-388-0961

Proponent(s)

Cox Construction Limited
965 York Road
Guelph, ON
N1H 6K5
Canada


Organe d’appel

Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca

About the Environmental Review Tribunal


Inclure les éléments suivants:

Numéro du REO
019-3595
Numéro de référence du ministère
5026-BYWVCQ

Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis

Proposition initiale

Numéro du REO
019-3595
Numéro de référence du ministère
5026-BYWVCQ
Type d'avis
Instrument
Loi
Ontario Water Resources Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Proposition affichée

Période de consultation

5 mai 2021 - 4 juin 2021 (30 days)

Détails de la proposition

This proposal is for an amendment to the existing Permit to Take Water (PTTW) No. 5755-A72SBP for Cox Construction Limited, for aggregate washing purposes. Water will be taken from one pond situated on a property located at 6711 Laird Road in the Township of Puslinch, Ontario. Cox Construction Ltd. is applying to amend the PTTW to move the source pond location to another location within the same licenced gravel pit. Details of the water takings are as follows:

  • source of water: dugout pond
  • purpose of taking: industrial (aggregate washing)
  • maximum rate per minute (litres): 4,164.00
  • maximum number of hours of taking per day: 12
  • maximum volume per day (litres): 2,998,037.00
  • maximum number of days of taking: 228
  • earliest date of taking: April 01
  • latest date of taking: November 15
  • period of taking: 10 years

More about Permits to Take Water.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

Cette consultation a eu lieu 5 mai 2021
au 4 juin 2021

Communiquer avec nous

Contact