Bruce Power Inc - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-3522
Numéro de référence du ministère
1000106736
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 16 avril 2021 au 31 mai 2021 (45 jours) Fermé
Dernière mise à jour

Update Announcement

This proposal notice has been updated on February 27, 2024, to advise the public that this file/application is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.

Cette consultation a eu lieu :

du 16 avril 2021
au 31 mai 2021

Résumé de la proposition

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 7477-8PGMTZ for Bruce Power Inc, a nuclear power plant located near Tiverton, Ontario.

Détails de l'emplacement

Adresse du site

177 Tie Road
Tiverton, ON
N0G 2T0
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Bruce Power Inc
177 Tie Road
Tiverton, ON
N0G 2T0
Canada

Détails de la proposition

This proposal is for the renewal of the Limited Operational Flexibility for an Environmental Compliance Approval (air & noise) No. 7477-8PGMTZ for Bruce Power Inc, a nuclear power plant located near Tiverton, Ontario.

The emission sources from the nuclear power plant and associated processes that exhaust to the air include:

  • steam venting
  • fume hoods
  • general building exhaust vents
  • diesel-fired backup generators
  • combustion equipment
  • supporting equipment and processes at the site

Emissions to the air from this facility include:

  • particulate matter
  • nitrogen oxides
  • carbon dioxide
  • hydrazine
  • morpholine
  • ammonia
  • manganese

The Environmental Compliance Approval with Limited Operational Flexibility (air), when issued, permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).

The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment at that time to renew these conditions.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 16 avril 2021
au 31 mai 2021

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis