Le présent avis est fourni à titre d’information seulement. Il n’existe aucune obligation de mener une consultation sur le Registre environnemental de l’Ontario à propos de cette initiative. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempted all proposals for policies, acts, regulations and instruments from posting requirements under the EBR.
Ontario Regulation 115/20 was revoked on June 15, 2020, however, we are posting this decision as a bulletin as because the proposal was posted on April 2, 2020 while Ontario Regulation 115/20 was in effect.
Although consultation was not required, the ministry did consult with the public on this approval by posting ERO # 019-1584 with a 45 day public comment period from April 2, 2020 to May 17, 2020.
To ensure transparency, the ministry is providing details of its decision and the effects of consultation on decision-making in this notice.
Détails
Location details
Site address
372 Jim Snow Drive
Loyalist Township, ON
K0H 1G0
Canada
Site location map
View this location on a map opens link in a new window
Proponent
Kiley Paving Ltd.
892 Fairbanks Street
Kingston, ON
K7P 0K6
Canada
We have issued an Environmental Compliance Approval (ECA) with Limited Operational Flexibility (air), which replaces all the current ECA (air) for this facility and includes the addition of new, or historically unapproved, sources for all emissions from Kiley Paving Ltd., producing hot mix asphalt, located in Bath, Ontario.
The approval includes all sources at the facility, including:
- one hot mix asphalt plant including material screening
- conveyors
- storage tanks with emissions controlled by one baghouse
- one materials depot
- one soil trummel unit
Emissions to the air from this facility include:
- particulate mater
- benzo(a)pyrene
- benzene
- naphthalene
- arsenic
- lead
- nickel
- nitrogen oxides
- other products of combustion
The ECA with Limited Operational Flexibility (air) permits modifications to the facility subject to limits on operational flexibility that include a production limit for the facility to be specified on the Environmental Compliance Approval with Limited Operational Flexibility (air).
The limited operational flexibility conditions have an expiry date. The company will be required to make an application for amendment when it is time to renew these conditions.
Effects of comments
The ministry did not receive any comments on the proposal.
Appeal information
Appeals are not allowed.
This instrument type cannot be appealed.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Rudolf Wan
135 St Clair Avenue West
Toronto,
ON
M4V 1P5
Canada