Cette consultation a eu lieu :
du 24 décembre 2020
au 23 janvier 2021
Résumé de la décision
Permit to Take Water No. P-300-2114724414 was issued on April 8, 2021 to Watersand Construction Ltd. for the purpose of construction dewatering. The permit expires on March 31, 2026.
Détails de l'emplacement
Adresse du site
Lot 5, Concession 9
(southwest corner of McKay Road West and Highway 400)
Barrie,
ON
Canada
Détails de l'emplacement du site
Lots 4-6, Concession 9
Lots 5-6, Concession 10
Lot 4, Concession 10 (Innisfil)
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
WATERSAND CONSTRUCTION LTD.
30 Floral Parkway
Vaughan,
ON
L4K 4R1
Canada
Détails de la décision
Permit to Take Water No. P-300-2114724414 was issued on April 8, 2021 to Watersand Construction Ltd. for the purpose of construction dewatering in Barrie and Innisfil, Ontario. The permit expires on March 31, 2026. The water taking source proposed in the original application has been separated into six water taking sources.
Details of the water taking are as follows:
Source 1: Arabella Marie Center (Arabella Shallow Utilities)
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 2.78
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 4,000
- maximum number of days of taking in a year: 365
Source 2: Deep Sewer
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 118.06
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 170,000
- maximum number of days of taking in a year: 365
Source 3: McKay Road West Center (McKay Shallow Utilities )
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 2.78
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 4,000
- maximum number of days of taking in a year: 365
Source 4: Pumping Station
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 225
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 324,000
- maximum number of days of taking in a year: 365
Source 5: Pumping Station
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 656.94
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 946,000
- maximum number of days of taking in a year: 365
Source 6: Veteran's Drive Center (Veteran's Shallow Utilities)
- purpose of taking: construction dewatering
- maximum rate per minute (litres): 2.78
- maximum number of hours of taking per day: 24
- maximum volume of taking per day (litres): 4,000
- maximum number of days of taking in a year: 365
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
How to Appeal
Cet avis de décision peut être porté en appel. Vous avez jusqu’à 15 jours à partir du 7 mai 2021 pour entamer le processus d’appel.
Veuillez lire les renseignements suivants attentivement pour en savoir plus sur le processus d’appel.
Comment interjeter appelClick to Expand Accordion
For instrument decisions published on or after June 1, 2021, please refer to the updated instructions for information on how to appeal a decision.
Appeal process for decisions published before June 1, 2021
If you’re an Ontario resident, you can start the process to appeal this instrument decision.
First, you’ll need to seek leave (i.e. get permission) from the relevant appellate body to appeal the decision.
If the appellate body grants leave, the appeal itself will follow.
Seek leave to appeal
To seek leave to appeal, you need to do these three things:
- prepare your application
- provide notice to the minister
- mail your application to three parties
1. Prepare your application
You’ll need to prepare an application. You may wish to include the following things in your application:
- A document that includes:
- your name, phone number, fax number (if any), and/or email address
- the ERO number and ministry reference number (located on this page)
- a statement about whether you are a resident in Ontario
- your interest in the decision, and any facts you want taken into account in deciding whether you have an interest in the decision
- the parts of the instrument that you’re challenging
- whether the decision could result in significant harm to the environment
- the reason(s) why you believe that no reasonable person – having regard to the relevant law and to any government policies developed to guide decisions of that kind – could have made the decision
- the grounds (facts) you’ll be using to appeal
- the outcome you’d like to see
- A copy of the instrument (approval, permit, order) that you you are seeking leave to appeal. You’ll find this in the decision notice on the Environmental Registry
- Copies of all supporting documents, facts and evidence that you’ll be using to appeal
What is considered
The appeal body will consider the following two questions in deciding whether to grant you leave to appeal:
- is there is good reason to believe that no reasonable person, with respect to the relevant law and to any government policies developed to guide decisions of that kind, could have made the decision?
- could the decision you wish to appeal result in significant harm to the environment?
2. Provide your notice
You’ll need to provide notice to the Minister of the Environment, Conservation and Parks that you’re seeking leave to appeal.
In your notice, please include a brief description of the:
- decision that you wish to appeal
- grounds for granting leave to appeal
You can provide notice by email at minister.mecp@ontario.ca or by mail at:
College Park 5th Floor, 777 Bay St.
Toronto, ON
M7A 2J3
3. Mail your application
You’ll need to mail your application that you prepared in step #1 to each of these three parties:
- appellate body
- issuing authority (the ministry official who issued the instrument)
- proponent (the company or individual to whom the instrument was issued)
WATERSAND CONSTRUCTION LTD.
30 Floral Parkway
Vaughan,
ON
L4K 4R1
Canada
Environmental Review Tribunal
Attention: The Secretary
655 Bay Street
Floor 15
Toronto, Ontario
M5G 1E5
(416) 212-6349
(866) 448-2248
OLT.Registrar@ontario.ca
Inclure les éléments suivants:
Il ne s'agit pas d'un avis juridique. Veuillez vous reporter à la Charte des droits environnementaux de 1993 pour connaître les exigences exactes prévues par la loi. Consultez un avocat si vous avez besoin d'aide avec le processus d'appel.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Permit To Take Water for WATERSAND CONSTRUCTION LTD. for the purpose of construction-dewatering.
Water will be taken from a sandpoints/wellpoints located at Lot 5, Concession 9, Innisfil, Ontario. The details of water taking are as follows:
- source name: construction
- purpose of taking: dewatering
- maximum rate per minute (litres per minute): 1,041.67
- maximum number of hours of taking per day: 24
- maximum volume of taking per day: 1,500,000 litres
- maximum number of days of taking in a year: 365
- earliest calendar date of taking (mm/dd): 01/01
- latest calendar date of taking (mm/dd): 12/31
- length of taking: 5 years
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 24 décembre 2020
au 23 janvier 2021
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0