Le présent avis est fourni à titre d’information seulement. Il n’existe aucune obligation de mener une consultation sur le Registre environnemental de l’Ontario à propos de cette initiative. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempted all proposals for policies, acts, regulations and instruments from posting requirements under the EBR.
Ontario Regulation 115/20 was revoked on June 15, 2020, however, we are posting this decision as a bulletin because the proposal was posted on April 2, 2020 while Ontario Regulation 115/20 was in effect.
Although consultation was not required, the ministry did consult with the public on this proposal by posting ERO# 019-1590 for public comment from April 2, 2020 to May 17, 2020. To ensure transparency, the ministry is providing details of its decision and the effects of consultation on decision-making in this notice.
Détails
Proponent(s)
Gerdau Ameristeel Corporation
1 Gerdau Drive
Whitby, ON
L1N 5T1
Location details
2025 River Road
London, ON
N5W 6C4
Instrument decision details
An Environmental Compliance Approval was granted to Gerdau Ameristeel Corporation, for ditches and stormwater management works located at 2025 River Road, in the City of London.
The stormwater management works are comprised of stormwater quality and quantity control features to capture and contain surface runoff within the Gerdau facility site boundaries and prevent stormwater from discharging offsite. The system consists of perimeter ditches and embankments, sediment traps, and a stormwater collection pond, and a dike along the southern property line to provide secondary containment and prevent stormwater discharge from the site during the regional storm event. Following storm events, the pond will be pumped and hauled offsite as needed to maintain sufficient capacity to manage storm event runoff and prevent any potential discharge from the site.
Comments received
0 received through the registry
0 received by mail
0 received by email
Effects of consultation
No comments were received.
Third parties are not able to apply for leave to appeal in respect of proposals which were posted while Ontario Regulation 115/20 was in effect between April 1, 2020 and June 14, 2020. Ontario Regulation 115/20 exempted all proposals for instruments from posting requirements under the EBR. Leave to appeal may only be sought in respect of instruments that are required to be posted to the ERO.
Appeal information
Appeals are not allowed. This instrument type cannot be appealed.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada