Cette consultation a eu lieu :
du 24 septembre 2020
au 8 novembre 2020
Résumé de la décision
The proposal was posted in error. Section 32 of the Environmental Bill of Rights (EBR) exempts these types of proposals for instruments from notice requirements under the EBR.
Détails de l'emplacement
Adresse du site
Windsor,
ON
N9J 1X6
Canada
Détails de l'emplacement du site
Part of Lots 22 and 23, Concession 3, Town of La Salle
Disputed Road Lots
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
Leptis Magna Developments Inc.
2470 Dougall Ave
Unit 2
Windsor,
ON
N8X 1T2
Canada
Détails de la décision
The proposal notice was posted in error.
It is the ministry's opinion that the issuance of this ECA (stormwater management works) would be needed to implement an undertaking that was approved under the Environmental Assessment Act (Schedule A of the Class EA process).
Section 32 of the Environmental Bill of Rights (EBR) exempts these types of proposals for instruments from notice requirements under the EBR.
Effets de la consultation
No comments were received.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
4510 Rhodes Dr
Windsor,
ON
N8W 5K5
Canada
135 St. Clair Avenue West
Floor 1
Toronto,
ON
M4V 1P5
Canada
How to Appeal
Appeals are not allowed
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Proposition initiale
Détails de la proposition
This proposal is for a new Environmental Compliance Approval to be issued to Leptis Magna Developments Inc., for the establishment of a stormwater management works structure servicing a proposed residential development located on a land legally described as parts of Lots 22 and 23, Concession 3, in the Town of La Salle, City of Windsor, Ontario.
The sewage works will include a temporary storage ditch and an oil and grit separator designed to provide water quantity and quality control prior to discharge from the site to the East Branch Cahill Drain, within the River Canard.
The project also involves the installation along Disputed Road and Leptis Magna Boulevard of storm sewers and sanitary sewers, outletting respectively into the stormwater management facility and the existing sanitary collection system.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Commentaire
La consultation est maintenant terminée.
Cette consultation a eu lieu 24 septembre 2020
au 8 novembre 2020
Communiquer avec nous
Contact
Client Services and Permissions Branch
135 St Clair Ave West
1st Floor
Toronto,
ON
M4V 1P5
Canada
Commentaires reçus
Par l'entremise du registre
0Par courriel
0Par la poste
0