Kingslea Developments Limited - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-1736
Numéro de référence du ministère
4597-BMDKLN
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 4 mai 2020 au 18 juin 2020 (45 jours) Fermé
Dernière mise à jour

Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-1736 on June 30, 2020.

Cette consultation a eu lieu :

du 4 mai 2020
au 18 juin 2020

Résumé de la proposition

This proposal is for a new Environmental Compliance Approval (Industrial Sewage) to be issued to Kingslea Developments Limited, for the construction of stormwater management works in support of a proposed light industrial office and warehouse building, located at 131 Ellis Drive in the City of Barrie, Ontario.

Détails de l'emplacement

Adresse du site

131 Ellis Drive
City of Barrie, ON
L4N 8Z3
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Kingslea Developments Limited
107 Woodbine Downs Blvd
Suite 16
Toronto, ON
M9W 6Y1
Canada

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.

Détails de la proposition

This proposal is for a new Environmental Compliance Approval (Industrial Sewage) to be issued to Kingslea Developments Limited, for the construction of stormwater management works in support of a proposed light industrial office and warehouse building, located at 131 Ellis Drive in the City of Barrie, Ontario.

The sewage works will include a dry pond, complete with storm sewers, for quantity control; and an oil-grit separator for quality control; with clean roof runoff directed to an infiltration trench on the east side of the site; discharging within the Lovers Creek Watershed.

Sanitary sewers will be connected to the existing city infrastructure on Ellis Drive.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 4 mai 2020
au 18 juin 2020

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis