Michael Tremblay - Mineral exploration permit

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Mineral exploration permit

Numéro du REO
019-1644
Numéro de référence du ministère
PR-20-000108
Type d'avis
Instrument
Loi
Mining Act, R.S.O. 1990
Affiché par
Ministry of Energy, Northern Development and Mines
Étape de l'avis
Ministry of Mines
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 9 avril 2020 au 9 mai 2020 (30 jours) Fermé
Dernière mise à jour

Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-6713 on March 1, 2023

Cette consultation a eu lieu :

du 9 avril 2020
au 9 mai 2020

Résumé de la proposition

The Ministry is proposing to issue a permit to Michael Tremblay and Philip Escher to undertake these early exploration activities: Mechanized Drilling and Pitting and Trenching of Bedrock. The location of the activities is within Palmer and Wishart townships.

Détails de l'emplacement

Détails de l'emplacement du site

The mining activities are located approximately 55 kilometres north of Sault Ste. Marie, Ontario, in Palmer and Wishart townships, District of Sault Ste. Marie, South Region.

“To view individual claims on a map please use the Mining Lands Administration System. Click on “I want to…” and select “Find a claim” to search by claim numbers or “Find a township” to search by township.”

Claim numbers: 546374, 546377, 546379, 546380, 546381, 546382

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Michael Tremblay
100 Superior Avenue
P.O. Box 337
wawa, ON
P0S 1K0
Canada

Philip Escher
190 MARKET STREET
THUNDER BAY , ON
P7A 8A5
Canada

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated. Notwithstanding the exemption, ENDM posted a proposal for this instrument for consultation, and has taken any responses received as a result of the posting into account.

Détails de la proposition

Michael Tremblay and Philip Escher has submitted an application to the ministry for an exploration permit as required under the Mining Act for prescribed early exploration activities.

The activities that this permit would allow Michael Tremblay and Philip Escher to carry out are as follows:

  • mechanized Drilling (greater than 150 kilograms)
  • pitting and Trenching of Bedrock (greater than 3 cubic metres in a 200 metre radius)

The potential disturbance from the activities are described as:

Pitting and Trenching: are conducted to gain a greater visual understanding of the rock. The potential environmental disturbance includes (but are not limited to): the use of heavy equipment to remove surface soil and expose rock and excavating or blasting of rock, leaving shallow holes or trenches that vary in depth and length.

Drilling: provides rock samples from below the surface. Testing the samples determines the properties of the soil and rocks, including mineral and metal content. Potential environmental disturbances include (but are not limited to): clearing surface terrain for “drill pads” (small areas cleared for drill rigs and/or helicopters), installing casings (hollow steel pipes called the collar), and pumping water from a sump, nearby lakes, rivers or streams.

Provincial standards for early exploration are required to be followed by proponents to minimize the impacts to public health, safety and the environment from early exploration activities described above. You can find the standards in the Activities Information Sheets or on the Ministry website under Mining Act Policies, Standards and Directives.

This notice is provided to receive comments that can be considered in the decision-making process prior to the issuance of an exploration permit.

An Exploration Permit does not relieve the proponent from compliance with any other requirements that are set out under the Mining Act or any other Act. All activities included in the Exploration Permit proposal must be carried out in compliance with Ontario Regulation 308/12 and the Provincial Standards for Early Exploration. The Exploration Permit duration will be up to 3 years with the possibility of one renewal for up to three years.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Mineral Development Office (Sudbury)
Address

933 Ramsay Lake Road
Floor B6
Sudbury, ON
P3E 6B5
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 9 avril 2020
au 9 mai 2020

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis