Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.
Update Announcement
A decision for this proposal has been published as a Bulletin under ERO # 019-1940 on June 18, 2020.
Cette consultation a eu lieu :
du 14 avril 2020
au 29 mai 2020
Résumé de la proposition
The Ministry has accepted the risk assessment prepared for the owner, UCANCO General Partners Inc., as part of the development plans for the property located at 609 West Street South in Orillia, Ontario. The Director is considering issuing a Certificate of Property Use ("CPU") in relation to the property.
Détails de l'emplacement
Adresse du site
609 West Street South
Orillia,
ON
Canada
Carte de l'emplacement du site
L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.
Afficher cet emplacement sur une carte opens link in a new windowPromoteur(s)
UCANCO General Partners Inc.
222 3rd Avenue SW
Suite 1500
Calgary,
AB
T2P0B4
Canada
Pourquoi une consultation n’est pas nécessaire
On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.
Détails de la proposition
A risk assessment was undertaken for this property to establish the risks that the contaminants identified in the risk assessment may pose to future users and to identify appropriate risk management measures to be implemented to ensure that the property is suitable for the intended use of Industrial/Commercial/Community Property Use as defined by O. Reg. 153/04 (the "Regulation"), as amended, made under the Environmental Protection Act, 1990 (the "Act").
The Ministry has accepted the risk assessment prepared for the owner as part of the development plans for the property.
Based on the documents provided to the Ministry as part of the risk assessment reports, the reviewers confirmed that the risk assessment has been conducted in accordance with the Act, the Regulation, and the associated guidance documents.
The Director provided the proponent with written Notice of the Director’s Decision to accept the risk assessment relating to the property in accordance with s.168.5 of the Act on December 23, 2019.
The Director is considering issuing a Certificate of Property Use ("CPU") in relation to the property. The CPU incorporates the risk management measures proposed in the risk assessment and any additional conditions proposed by the Director. A Section 197 Order is included and requires that a certificate be registered on the property title in accordance with section 197 of the Act and that before dealing with the property in any way, a copy of the CPU must be given to any person who will acquire an interest in the property.
The proposed risk management measures include:
- restrictions regarding building construction on, and the use of, the property
- maintaining a barrier to impacted soils and ground water
- implementation of vapour control systems
- ground water and vapour monitoring requirements
- implementing soil and ground water management plans
- a health and safety plan
- reporting requirements
The proposed draft CPU No. #7773-BKSQSC including the Section 197 Order, is provided as a link under the Supporting Materials section of this notice.
Documents justificatifs
Consulter les documents en personne
Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.
Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.
Communiquer avec nous
Contact
Cindy Hood
54 Cedar Pointe Drive
Unit 1201
Barrie,
ON
L4N 5R7
Canada
Commentaire
La consultation est maintenant terminée.
La période de consultation a eu lieu du 14 avril 2020
au 29 mai 2020