Metrocon Readymix Corp. - Environmental Compliance Approval (air)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (air)

Numéro du REO
019-1625
Numéro de référence du ministère
2770-BMSMQG
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 14 avril 2020 au 29 mai 2020 (45 jours) Fermé
Dernière mise à jour

Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Update Announcement

This proposal notice has been updated on January 19, 2023 to advise the public that this file is still under active review. The ministry is reviewing the comments it has received to date. The original proposal date and comment period have not been altered.

Cette consultation a eu lieu :

du 14 avril 2020
au 29 mai 2020

Résumé de la proposition

This proposal is for a new Environmental Compliance Approval (Air) for Metrocon Readymix Corp., a ready-mix concrete batching plant located at 89 Fenmar Drive in Toronto, Ontario.

Détails de l'emplacement

Adresse du site

89 Fenmar Drive
Toronto, ON
M9L 1M3
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Metrocon Readymix Corp.
65 Passmore Avenue
toronto, ON
M1V 4T2
Canada

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.

Détails de la proposition

This proposal is for a new Environmental Compliance Approval (Air) for Metrocon Readymix Corp., a ready-mix concrete batching plant located at 89 Fenmar Drive in Toronto, Ontario.

This application includes all emission sources from the facility that exhaust to the atmosphere including one ready-mix concrete plant including the following equipment:

  • two storage silos with associated dust collectors
  • the loading point for materials and associated dust collector
  • material handling
  • a natural gas-fired boiler

Contaminant emissions to the air from this facility include particulate matter including portland cement and slag, nitrogen oxides and other products of combustion.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 14 avril 2020
au 29 mai 2020