Gerdau Ameristeel Corporation - Environmental Compliance Approval (sewage)

La traduction française de cet avis n'est pas disponible. Nous nous excusons pour le dérangement.

Type d'acte: Environmental Compliance Approval (sewage)

Numéro du REO
019-1590
Numéro de référence du ministère
9484-BLSQRP
Type d'avis
Instrument
Loi
Environmental Protection Act, R.S.O. 1990
Affiché par
Ministry of the Environment, Conservation and Parks
Étape de l'avis
Proposition Mis à jour
Proposition affichée
Période de consultation
Du 2 avril 2020 au 17 mai 2020 (45 jours) Fermé
Dernière mise à jour

Il n’existe aucune obligation d’afficher cet avis sur le Registre environnemental de l’Ontario, mais nous voulons connaître votre opinion. Soumettez un commentaire et donnez-nous votre avis. Pour en savoir davantage sur le processus de consultation et les types d’avis publiés sur le registre.

Update Announcement

A decision for this proposal has been published as a Bulletin under ERO 019-2598 on November 20, 2020.

Cette consultation a eu lieu :

du 2 avril 2020
au 17 mai 2020

Résumé de la proposition

The proposal is for a new Environmental Compliance Approval for industrial ditches and stormwater management works serving Gerdau Ameristeel Corporation, located at 2025 River Road, in the City of London.

Détails de l'emplacement

Adresse du site

2025 River Road
London, ON
N5W 6C4
Canada

Carte de l'emplacement du site

L'épingle de localisation correspond à la zone approximative où a lieu l’activité environnementale.

Afficher cet emplacement sur une carte opens link in a new window

Promoteur(s)

Gerdau Ameristeel Corporation
1 Gerdau Drive
Whitby, ON
L1N 5T1
Canada

Pourquoi une consultation n’est pas nécessaire

On April 1, 2020, the Ontario Government made a temporary regulation to respond to the COVID-19 outbreak. Ontario Regulation 115/20 exempts all proposals for policies, acts, regulations and instruments from posting requirements under the EBR until 30 days after the declared emergency is terminated.

Détails de la proposition

The proposal is for a new Environmental Compliance Approval for industrial ditches and stormwater management works serving Gerdau Ameristeel Corporation, located at 2025 River Road, in the City of London.

The stormwater management works are comprised of stormwater quality and quantity control features to capture and contain surface runoff within the Gerdau facility site boundaries and prevent stormwater from discharging offsite. The system consists of perimeter ditches and embankments, sediment traps, and a stormwater collection pond. The pond is designed to collect storm runoff from the site during a 24-hour, 100-year design storm event plus runoff generated during a 25 mm rainfall event.

A dike has been designed and constructed along the southern property line to provide secondary containment and prevent stormwater discharge from the site during the regional storm event. There will be no permanent pool maintained in the pond and it is, therefore, considered a dry pond.

Following storm events, the pond will be pumped as needed to maintain sufficient capacity to manage storm event runoff and prevent any potential discharge from the site. The pumped volumes will be trucked by a licensed waste hauler for disposal at a City of London Wastewater Treatment Plant or similar facility.

Documents justificatifs

Consulter les documents en personne

Certains documents justificatifs peuvent ne pas être accessibles en ligne. Si tel est le cas, vous pouvez demander à consulter les documents en personne.

Veuillez communiquer avec le bureau mentionné ci-dessous pour savoir si les documents sont accessibles.

Client Services and Permissions Branch
Address

135 St Clair Ave West
1st Floor
Toronto, ON
M4V 1P5
Canada

Office phone number
London District Office (Southwest Region)
Address

733 Exeter Road
London, ON
N6E 1L3
Canada

Office phone number

Commentaire

La consultation est maintenant terminée.

La période de consultation a eu lieu du 2 avril 2020
au 17 mai 2020

Communiquer avec nous

Contact

S'inscrire pour obtenir des avis

Nous vous enverrons des avis par courriel accompagnés de toute mise à jour liée à cette consultation. Vous pouvez modifier vos préférences relatives à l'avis en tout temps en allant à votre page de profil où se trouvent vos paramètres.

Suivre cet avis